• CSLB #1085596
  • A+ Rated · 4.9· 80+ BBB reviews
  • 4.9· 150+ Google reviews
  • 1,000+ Projects Completed
Service
Kitchen remodel: cabinets, sink, windows, tile, floor, lighting
Location
Burbank, Los Angeles County
Home type
1930s single-story bungalow, kitchen last redone in 2004
Timeline
June to August 2026, eight weeks on site
Materials
White Shaker cabinets, fireclay sink, quartz, white square tile, red oak
Scope
Permit, windows, ceiling, circuits, hood duct, cabinets, tile, floor

About This Project · 5-minute read

The House Left Clues

Stand in the hallway of this 1930s Burbank bungalow and the first clue is under your feet. The oak floor runs to the kitchen doorway and stops at terracotta tile set on a diagonal. Behind that line sat a 2004 kitchen: golden maple, speckled granite, a microwave over the range, and a top-freezer refrigerator crowding the window. This kitchen remodel took its cues from the rest of the house instead.

Kitchen before the remodel with maple cabinets, speckled granite, a top-freezer refrigerator, and terracotta tile, Burbank
Before: the 2004 kitchen.
White Shaker kitchen with a fireclay sink, a butcher block island on a slate blue base, and red oak floors, Burbank
After: the same room, in the house’s own style.
Salvador Lopez, lead project manager at Hybrid Renovations

In an older house we look around before we draw anything. The house usually tells you what the kitchen was supposed to be.

Salvador LopezLead Project Manager

Clue one: the oak in the hallway

Terracotta tile floor set on a diagonal in front of the refrigerator and maple sink cabinets, before the remodel, Burbank
Before: terracotta tile on a diagonal.
Red oak floor under a butcher block island with turned legs and two rush-seat stools, by Hybrid Renovations
After: red oak, the same as the hall.

What we found

Under the tile and its mortar bed was the house’s original red oak. It had been cut short where the 2004 cabinets stood, and the boards near the old dishwasher were stained dark.

What we did

We pulled the damaged boards and laid new red oak of the same width up to the doorway. Once the cabinets were in, the kitchen and the hallway were sanded and finished together, so the color matches across the line where the tile used to stop.

Clue two: the window openings

Two plain white double-hung windows over the sink run, under recessed lights, before the kitchen remodel, Burbank
Before: plain sashes.
Two six-over-one double-hung windows over the sink with milk glass schoolhouse pendants, by Hybrid Renovations
After: six panes over one.

The twin openings over the sink stayed where they were. New wood double-hung windows replaced the plain sashes: six panes in each upper sash over a single pane below, trimmed in one wide white casing to match the doorway. Two milk glass schoolhouse pendants now hang in front of them.

Stainless double sink and chrome faucet in speckled granite, with a dish rack and a knife block, before the remodel, Burbank
Before: a stainless double sink.
White fireclay farmhouse sink with an aged brass bridge faucet, a pot of thyme, and square white tile, by Hybrid Renovations
After: fireclay, with a brass bridge faucet.

Below the windows, the double sink became a white fireclay farmhouse sink with an aged brass bridge faucet. The speckled granite and almond tile gave way to white quartz and square white tile up to the sill and the uppers.

Setting a fireclay sink

  1. Sink first. Fireclay varies a little from piece to piece, so the sink was on site before its cabinet was cut.
  2. Rails under it. Support rails inside the base, sized to the sink’s weight full of water.
  3. Then the stone. The quartz was measured with the sink already set, so the counter meets the sink that was delivered.

Where the house had no clue: the refrigerator

A 1930s kitchen was never drawn around a modern refrigerator. In 2004 it went on the back wall beside the window, which left the sink run short of counter.

Plain tan wall with one switch and an open doorway, the top-freezer fridge in the back corner, before the remodel, Burbank
Before: a plain wall, the fridge in the back corner.
Stainless French-door refrigerator in a white Shaker surround beside the open doorway to the hall, by Hybrid Renovations
After: a French-door fridge beside the doorway.

Where does the refrigerator go?

Considered

Back beside the window, or at the end of the range wall by the front corner.

Chosen

The left wall, between the doorway and the front corner, in a white Shaker surround.

Why: By the window it took the counter. At the end of the range wall it would have sat against the front wall, where its door couldn’t open all the way. Beside the doorway it has open floor in front of it, so the doors open all the way and the drawers pull out.

The new French-door refrigerator has a cabinet above it to the ceiling. With the old one gone from the back wall, that run now turns the corner and stops at the doorway: a stack of drawers, two narrow doors, and the dishwasher, with a tall pair of uppers over the end.

Clue three: the plain wall by the front corner

Maple range wall with a microwave over the gas range, an angled corner pantry, and a grapevine tile band, before, Burbank
Before: maple to the end of the run.
Range wall with a plaster hood, white Shaker cabinets, and a peg rail with an apron and a basket, by Hybrid Renovations
After: a peg rail where the run ends.

The old range wall ended in a maple panel and bare wall to the front corner. We kept that wall free of cabinets. A white Shaker peg rail at head height holds an apron and a straw basket, and a small step stool below it reaches the upper cabinets.

Clue four: a hood, not a microwave

Stainless gas range under a stainless microwave, maple cabinets, and a toaster on the granite, before the remodel, Burbank
Before: a microwave over the range.
Smooth plaster hood over a stainless gas range with a kettle, beside drawers with brass cup pulls, by Hybrid Renovations
After: a plaster hood, vented outside.

The gas range stayed on the right wall. The microwave over it came down, and a smooth plaster hood took its place, with the same tile from the counter up to it. Beside the range sit three drawers with brass cup pulls.

Plaster outside, metal inside

The hood’s fan and lights are a metal insert, ducted outside. We framed the shell around it to the insert maker’s clearances, then covered it in plaster.

Clue five: the corner

Tall maple corner pantry with an angled door beside the window and the microwave, before the kitchen remodel, Burbank
Before: an angled corner pantry.
Back corner with a single white Shaker upper that stops short of the wall, a spoon crock, and the hood, by Hybrid Renovations
After: one upper, and a strip of wall.

The 2004 kitchen filled the back corner with a tall pantry on an angle. Now a base cabinet turns the corner under a crock of spoons, and a single Shaker upper stops just short of the side wall, leaving a strip of butter-yellow wall.

Clue six: the size of the room

Open terracotta tile floor in front of the maple sink run, with the refrigerator by the window, before the remodel, Burbank
Before: open floor in the middle.
Small butcher block island on turned legs under two schoolhouse pendants, by Hybrid Renovations, Burbank
After: an island on legs.

This is a small kitchen, so the island is built like a table: a slate blue base with three drawers, four turned legs, and a worn butcher block top, with two rush-seat stools. The floor shows under it, which keeps the room from feeling filled.

The ceiling was tested first

The 2004 ceiling had a sprayed texture. Before anyone scraped it, a sample went to a lab for asbestos. It came back clean, so the texture came off wet and the ceiling was skimmed flat.

Build log

Eight weeks on site, permit to final inspection

  • Before demo

    Ceiling test and permit. Lab test on the ceiling texture, permit approved, windows, cabinets and sink ordered.

  • Week 1

    Demo. Cabinets, granite, tile and mortar bed out, original oak found.

  • Week 2

    Rough-in. Fridge outlet, pendant boxes, hood duct, range gas connection, sink drain moved.

  • Week 3

    Inspection, windows, ceiling. Rough inspection passed, new windows set, ceiling skimmed, walls closed.

  • Week 4

    Floor laid. Damaged boards out, new red oak laid to the hallway floor.

  • Weeks 5–6

    Cabinets, sink, quartz. Runs and surround set, fireclay sink on its rails, quartz installed.

  • Weeks 7–8

    Tile, hood, finish. Tile, plaster hood, floor sanded and finished, island in. Final inspection passed.

Project specs

Cabinets
White Shaker, aged brass cup pulls and knobs
Counters
White quartz with soft gray veining
Sink
White fireclay farmhouse sink, aged brass bridge faucet
Backsplash
Square white tile, 4 by 4 inches
Range hood
Smooth plaster shell over a ducted metal insert
Refrigerator
Stainless French-door in a white Shaker surround
Island
Slate blue base, turned legs, butcher block top
Windows
Wood double-hung, six panes over one
Lighting
Two milk glass schoolhouse pendants
Floor
Red oak strip, finished with the original hallway oak
Refrigerator surround and hall doorway on the left, the island and the sink windows ahead, by Hybrid Renovations, Burbank
After: the fridge, the doorway, and the island in one view.

Apart from the oak underfoot, everything here is new, and most of it follows something the house already had. The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Los Angeles County, including Glendale, Pasadena, and North Hollywood.

The service behind this project

Looking for a kitchen remodeling contractor in Los Angeles County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

No. Fireclay is fired with a glaze that doesn’t soak up stains, so most marks wipe off with a mild cleaner and a soft sponge. Skip steel wool and harsh powders, which dull the glaze, and a rack in the bottom keeps heavy pans from chipping it.

Usually, when it’s the same species and the same board width. The new boards are laid to meet the old ones, then both floors are sanded and finished together, so the color and sheen match across the doorway.

Wipe spills up quickly and oil the wood with a food-safe board oil whenever it starts to look dry, more often in the first months. Scratches and small burns can be sanded out and re-oiled, which a painted or stone top can’t offer.

Usually, yes. When the framing around an opening is sound, new windows are ordered to its measured size, so the walls around it stay put and the outside wall isn’t cut wider. The casing can still change, as it did here.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project