• CSLB #1085596
  • A+ Rated · 4.9· 80+ BBB reviews
  • 4.9· 150+ Google reviews
  • 1,000+ Projects Completed
Service
Kitchen remodel: windows, range, ceiling, cabinets, stone, floor
Location
Huntington Beach, Orange County
Home type
Single-story 1960s tract home, kitchen last redone in the 2000s
Timeline
June to August 2026, ten weeks on site
Materials
Painted inset Shaker, honed marble, marble and brass tile, slate
Scope
Permit, wall moved, two windows, gas line, ceiling, cabinets, floor

About This Project · 5-minute read

Five Lines on an Index Card

On our first visit to this Huntington Beach kitchen, the owners had an index card taped to the microwave door. Five lines, written in pen. The room itself was in fine shape: maple cabinets, beige granite, a U of counters with one window over the sink. It just wasn’t the kitchen they wanted to cook in. This kitchen remodel answers that card, one line at a time.

What they asked for

Taped to the microwave door

  • More daylight at the sink
  • A real range, with a hood worth looking at
  • Give the back corner to a plant
  • Stone that stays cool under bread dough
  • No more track light
U-shaped kitchen before the remodel with maple cabinets, beige granite, one window, and a microwave, Huntington Beach
Before: one window and a closed U.
U-shaped kitchen with cream inset cabinets, marble counters, a plaster hood, and three windows, by Hybrid Renovations
After: the same view from the doorway.

More daylight at the sink

Stainless double sink and pull-out faucet under a single picture window with plain wall beside it, before, Huntington Beach
Before: one window, plain wall beside it.
White fireclay apron sink and brass bridge faucet centered under the picture window, by Hybrid Renovations
After: the same picture window over a new apron sink.

The picture window over the sink stayed where it was. Each side of it now has a narrow casement of its own, so light comes in across the whole back of the room instead of through one square.

Two openings in a bearing wall

  1. Permit and headers. Each opening got a header sized for the roof load above it, on the permit drawings.
  2. Shored and cut. Temporary supports went up inside, then the stucco, sheathing, and studs came out.
  3. Flashed and set. The casements were flashed into the weather barrier before the stucco was patched and painted outside.

What we found

The sink’s plumbing vent ran up through the wall exactly where the left casement needed to go.

What we did

We rerouted the vent sideways in the wall cavity to the next stud bay, and the inspector signed off before the wall closed.

Under the window, the stainless double sink gave way to a white fireclay apron-front sink and an unlacquered brass bridge faucet. The brass will darken where hands touch it, and the owners wanted exactly that.

A real range, with a hood worth looking at

30-inch electric range under a stainless microwave and maple cabinets, tumbled tile behind, before, Huntington Beach
Before: a 30-inch range under a microwave.
48-inch dual-fuel range under a white plaster hood with a walnut band, by Hybrid Renovations, Huntington Beach
After: 48 inches of range, a plaster hood.

The old 30-inch electric range and the microwave above it came out, and a 48-inch dual-fuel range went in: gas burners on top, an electric oven below. That meant two runs. A new gas line reached the range wall, and the oven kept a 240-volt circuit of its own. The new hood vents outside; the microwave had only blown the air back into the room.

Salvador Lopez, lead project manager at Hybrid Renovations

A range this size moves a lot of heat and steam. We sized the hood’s fan and duct to the range first, then built the plaster shell around it. The shape is the easy part.

Salvador LopezLead Project Manager

Stainless hood or plaster?

Considered

A stainless chimney hood to match the range.

Chosen

A smooth white plaster hood over a steel insert, with a walnut band and slim brass trim.

Why: The owners wanted the hood to read as part of the wall. The plaster takes the white of the room, and the walnut band ties it to the brass on the range’s knobs.

Give the back corner to a plant

Maple base cabinets and granite counter turning the back corner beside the range, before the remodel, Huntington Beach
Before: cabinets turned the corner.
Open corner with a bird of paradise in a round white planter beside a short marble counter, by Hybrid Renovations
After: open floor and a bird of paradise.

The old U ran its counter straight around the back-right corner, into a deep, hard-to-reach cabinet. Those corner cabinets came out. The counter left of the range now ends in a short marble strip over a flat cream panel, and the corner is open floor, where a bird of paradise stands in a round white planter in front of the new casement.

Losing cabinets on purpose

Giving up a corner means finding the storage elsewhere. The uppers now run to the crown, and the drawers right of the range hold the pots the corner used to swallow.

Stone that stays cool under bread dough

Stainless fridge, maple cabinets with nickel bar pulls, beige granite, and two windows, before, Huntington Beach
Before: granite, maple, bar pulls.
Stainless fridge standing proud of cream inset cabinets with brass pulls and honed marble, by Hybrid Renovations
After: honed marble, cream, brass.

The counters are honed white marble with an eased edge and soft gray veins. The backsplash is the same marble cut into diamonds, set with thin brass lines between them, running up to the hood behind the range and ending where each counter ends. The cabinets are cream painted inset Shaker, the doors set flush inside their frames, with unlacquered brass cup pulls on the drawers and small brass knobs on the doors.

What honed marble asks of you

Lemon juice and vinegar can leave dull marks on marble. A honed finish hides them far better than a polished one, and we sealed the stone before handover.

No more track light

Flat ceiling with a brushed nickel track light over maple upper cabinets and the microwave, before, Huntington Beach
Before: a flat ceiling and a track light.
Shallow tray ceiling with crown moulding, recessed lights, and a brass three-light chandelier, by Hybrid Renovations
After: a tray, crown, and a chandelier.

Raising the ceiling would have meant cutting into the roof framing. Instead we dropped the edges: a framed band runs around the room a few inches lower, and crown moulding finishes the step, so the middle reads as a shallow tray. The recessed lights sit in that lower band, and the center holds a small brass three-light chandelier on a ceiling box rated for it.

What wasn’t on the card: more room

Stainless French-door refrigerator next to maple cabinets, a dishwasher, and a small window, before, Huntington Beach
Before: a short fridge wall.
Stainless French-door fridge under a cream cabinet beside inset cabinets and a dishwasher, by Hybrid Renovations
After: the same wall, moved and longer.

Behind the doorway wall sat a shallow closet the owners never opened. The attic showed that wall carried no roof load, so it came down and went back up past the closet. Both side walls got longer. The fridge wall went from one base cabinet and two uppers to a full run, and the refrigerator moved out with the wall, on an extended water line.

The floor changed too: the laminate came up, and dark slate went down in a mix of large squares, small squares, and rectangles, set over the slab. The walls went from butter yellow to a warm white.

Build log

Ten weeks on site, permit to final inspection

  • Before demo

    Drawings and permit. Window headers drawn, permit approved, cabinets and range ordered.

  • Weeks 1–2

    Demo and openings. Kitchen out, doorway wall moved, window openings framed, vent rerouted.

  • Week 3

    Rough-in. Gas line, range circuit, hood duct, light boxes. Rough inspection passed.

  • Weeks 4–5

    Ceiling and walls. Tray band framed, drywall, crown, paint, stucco patched outside.

  • Weeks 6–7

    Floor and cabinets. Slate set, cabinets installed, marble templated.

  • Weeks 8–10

    Stone, tile, finish. Marble, tile, sink, range, plaster hood, lights. Final inspection passed.

Project specs

Cabinets
Cream painted inset Shaker, unlacquered brass cup pulls and knobs
Counters
Honed white marble, eased edge
Backsplash
White marble diamonds with thin brass lines
Range
48-inch dual-fuel, stainless, brass knobs
Range hood
White plaster over a steel insert, walnut band, ducted outside
Sink
White fireclay apron front, unlacquered brass bridge faucet
Windows
Two new casements beside the picture window
Ceiling
Shallow tray, crown moulding, recessed lights
Lighting
Brass three-light chandelier
Floor
Slate tile in mixed sizes
Range wall with a plaster hood, cream inset uppers and drawers, and white marble diamond tile, by Hybrid Renovations
After: the range wall, straight on.

Every line on the card got its answer, and the card itself went into a drawer. The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Fountain Valley, Westminster, and Costa Mesa.

The service behind this project

Looking for a kitchen remodeling contractor in Orange County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

Usually, yes. The new opening needs a header sized for the load above it, a permit, and flashing that ties into the wall’s weather barrier before the stucco or siding is patched. We check what runs inside the wall first, since plumbing vents and wiring often sit right where a window wants to go.

Yes. A dual-fuel range cooks on gas burners and bakes in an electric oven, so it needs both: a gas supply sized for the burners and its own 240-volt circuit for the oven. The gas work is pressure-tested and inspected under the permit.

It works if you know what to expect. Marble is softer than granite, and acids like lemon juice or vinegar can leave dull marks called etching. A honed finish hides those marks far better than a polished one, and sealing it helps it resist stains.

There are two ways. Raising the middle of the ceiling usually means changing the roof framing, with an engineer’s plan. Dropping the edges instead leaves the framing alone: a framed band runs around the room a few inches lower, and crown moulding finishes the step.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project