• CSLB #1085596
  • A+ Rated · 4.9· 80+ BBB reviews
  • 4.9· 150+ Google reviews
  • 1,000+ Projects Completed
Service
Kitchen remodel: bay window, cabinets, counters, floor, lighting
Location
Irvine, Orange County
Home type
Two-story 2004 tract home on a post-tension slab
Timeline
June to September 2026, twelve weeks on site
Materials
Stained oak, white Shaker, white quartz, marble-look tile, white oak
Scope
Permit, bay framing, windows, gas, electrical, plumbing, finishes

About This Project · 5-minute read

From the First Coffee to the Last Dish

The owners of this 2004 Irvine tract home didn’t bring us a mood board. They brought a weekday: two kids, two jobs, one kitchen that fought them from the first coffee to the last dish. So we planned their kitchen remodel hour by hour, and that’s how this story runs.

6:30 AM: Coffee in the corner

Coffee maker in a corner under cherry wall cabinets, with diagonal beige tile and black granite, before, Irvine
Before: cherry cabinets crowding the corner.
White glass-front upper over a stainless toaster, a coffee maker, and an oak cutting board, by Hybrid Renovations
After: white glass uppers and marble-look tile.

The coffee maker sat under heavy cherry cabinets. Now the room is two-tone: dark-stained oak on the tall cabinet, the range run, and the island, and white painted Shaker on the uppers and around the bay. The glass uppers by the corner hold the everyday dishes, and the marble-look tile runs to the corner in level rows.

7:15 AM: Breakfast at the island

Small cherry island with a black granite top and no seating, in front of the sink wall, before the remodel, Irvine
Before: a small island with nowhere to sit.
Two-level kitchen island with a lower oak table end, two black stools, and white quartz tops, by Hybrid Renovations
After: two levels and two stools.

The old island was a place to set groceries down. The new one has two levels. The far end stands at counter height with a prep sink and an outlet in the riser between the levels. The near end drops to table height on two oak posts, so the kids sit with their feet near the floor.

The prep sink needed a drain under the floor, and a garage stamp said the house sits on a post-tension slab, with steel cables under tension inside the concrete. We scanned and marked every cable, and a structural engineer approved the trench route before any saw cut.

Looking across a small granite island to a double sink under three windows in a flat wall, before, Irvine
Before: the island faced a flat wall.
Both island levels lined up with the bay window and farmhouse sink, under two lantern pendants, by Hybrid Renovations
After: the island lines up with the bay.

Noon: Light from three directions

Flat kitchen wall with three windows over cherry cabinets, a double sink, and a stainless dishwasher, before, Irvine
Before: three windows in one flat wall.
Bay window wall with two double-hung windows, an arched window, and white Shaker cabinets, by Hybrid Renovations
After: a bay of three walls.

Bigger windows or a bay?

Considered

Wider windows in the same flat wall.

Chosen

A bay that pushes the sink wall out, with an arched window in the middle.

Why: Wider glass would still face the block wall head-on. A bay lets light in from three directions.

Angel Valle, project manager at Hybrid Renovations

A bay looks like a window job from inside. It isn’t. It’s a small addition, with a footing, a roof, and an inspector at every stage.

Angel ValleProject Manager

How the bay went up

  1. Plans first. A structural engineer drew the footing, the framing, and the beam across the bay’s opening, and the city approved the permit before demo.
  2. Footing and slab. We dug and poured a new footing, then the floor of the bay, doweled to the house slab where the scan showed it clear.
  3. Three walls and a roof. The old wall came out under temporary supports. Two angled sides, a center wall, and a small roof went up, then flashing and stucco to match.
  4. New windows. Two double-hung windows on the angles and an arched window in the middle, all dual-pane, to California’s energy rules.

What we found

With the old wall open, the sink’s drain vent ran up inside it, and that whole wall was coming out.

What we did

Our plumber ran a temporary vent while the bay was framed, then moved it into the bay’s new left side wall.

Stainless double sink and brushed faucet under three windows, with black granite and a dish rack, before, Irvine
Before: a stainless double sink.
Close view of the fireclay apron sink under the window, with a black faucet and white Shaker drawers, Irvine
After: a fireclay farmhouse sink on the window’s center line.

The fireclay farmhouse sink sits centered under the arch, on a support frame built inside its base cabinet, because the cabinet’s sides alone can’t carry it full of water. The dishwasher beside it wears a white panel to match the drawers on the bay’s right side.

3 Walls in the bay where one flat wall stood
2 Island levels, one at table height
12 Weeks on site

5:30 PM: Dinner for four

Range wall before the remodel with cherry cabinets, a microwave over a 30-inch range, and a side-by-side fridge, Irvine
Before: a microwave over the range.
Range wall with a white plaster hood, a herringbone tile panel, a pot filler, and glass uppers, by Hybrid Renovations
After: a plaster hood and a herringbone panel.

The range stayed on its wall and grew from 30 inches to 48. It’s dual fuel: four gas burners and a griddle on top, two electric ovens below. That meant work the old gas range never needed.

Behind the range wall

  1. A 240-volt circuit. The ovens run on electricity, so a dedicated circuit came from the panel, sized to the range’s install manual.
  2. A bigger gas line. The new burners and griddle draw more gas than the old range did, so the line was sized up to match.
  3. A ducted hood. The microwave came down. A hood insert inside the curved plaster shell vents outside through rigid duct.
  4. A pot filler. A cold line runs up the wall to the faucet centered in the herringbone panel.
30-inch stainless gas range under a microwave, between cherry cabinets with black granite, before, Irvine
Before: four burners and one oven.
48-inch stainless dual-fuel range with a center griddle and two ovens, by Hybrid Renovations in Irvine
After: a center griddle and two ovens.

6:15 PM: Groceries away

Cherry pantry cabinet beside a stainless side-by-side refrigerator with a water dispenser, before, Irvine
Before: a pantry and a stainless fridge.
Tall dark oak cabinet with a paneled refrigerator, a freezer drawer, and black bar pulls, by Hybrid Renovations
After: one oak tall cabinet, fridge inside.

We picked the panel-ready refrigerator before ordering cabinets, because the opening is built to its maker’s published size. Its oak panels follow the maker’s drawings, so the tallest thing in the room reads as one cabinet. Pantry goods moved to the deep drawers on the range wall.

9:00 PM: Lights low

Flush ceiling light with three amber glass shades over cherry wall cabinets, before the kitchen remodel, Irvine
Before: one flush light with amber shades.
Two black lantern pendants with brass candle lights in front of a white plaster range hood, by Hybrid Renovations
After: two lanterns in front of the plaster hood.

One flush fixture and a single can used to light the whole kitchen. Now recessed cans light the counters, and two black lantern pendants hang over the island on their own dimmer. Engineered white oak replaced the tile and runs into the dining room, glued to the slab after a moisture test.

Build log

Twelve weeks on site, demo to final inspection

  • Before demo

    Plans and permit. Engineering, plan check, and the appliances chosen so the cabinets could be ordered.

  • Weeks 1–2

    Demo and slab. Kitchen out, cables marked, island trench cut, bay footing inspected and poured.

  • Weeks 3–5

    The bay. Framing, roof, windows, and the vent moved.

  • Weeks 6–7

    Rough-in. Gas, wiring, duct, and drain lines inside the open walls. Rough and framing inspections passed.

  • Weeks 8–10

    Floor and cabinets. White oak down, cabinets and sink set, quartz templated.

  • Weeks 11–12

    Tile and finish. Quartz, tile, hood, appliances, lanterns. Final inspection passed.

Project specs

Window wall
Bay of three walls, arched center window
Cabinets
Dark-stained oak and white painted Shaker
Island
Two levels, prep sink, table end on oak posts
Counters
White quartz with gray veining
Backsplash
Marble-look tile, herringbone panel at the range
Sink
White fireclay farmhouse sink, matte black faucet
Range
48-inch dual fuel, center griddle, two ovens
Range hood
Curved plaster, ducted outside
Refrigerator
Panel-ready, oak panels, freezer drawer
Floor
Engineered white oak, glued to the slab

Breakfast used to be a traffic jam. Now the kids eat at their end of the island while I make lunches at the other, and the window over the sink is the first thing I see.

Megan R.Homeowner, Irvine

One weekday shaped every choice here, from the bay over the sink to the table-height end of the island. The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Tustin, Lake Forest, and Costa Mesa.

The service behind this project

Looking for a kitchen remodeling contractor in Orange County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

Yes, and how much work it is depends on the type. A bay window unit that hangs off the wall may need a larger opening and header, plus support brackets and a roof cap. A bay that brings the floor and the counters out with it is a small addition: it needs a foundation, a roof of its own, and a building permit with structural plans.

Yes. Fireclay is heavy, so the sink sits on a support frame built inside the base cabinet, not on the cabinet’s thin sides alone. The cabinet front is cut down to fit the apron. Use the sink maker’s spec sheet for the cabinet width and the support it calls for.

An opening built to the size the maker publishes for that model, and door panels made to its drawings. The panels mount with the maker’s own hardware, so the fridge reads as one more cabinet. Choose the model before the cabinets are ordered, because the opening is built around it.

The National Kitchen and Bath Association’s guidelines call for about 24 inches of width per seat. Knee space runs 18 inches deep at a 30-inch table height, 15 inches at a 36-inch counter, and 12 inches at a 42-inch bar. A lower table level gives the most legroom.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project