Kitchen remodel: cabinets, induction, tile, floor, lighting
Location
Newport Beach, Orange County
Home type
Single-story 1970s tract home, kitchen last redone around 2006
Timeline
August to October 2026, nine weeks on site
Materials
Black-stained ash, quartz, green glazed tile, white oak
Scope
Permit, gas cap, new circuits, venting, cabinets, tile, floor

About This Project · 5-minute read

Same L, Everything Else Traded

L-shaped kitchen before the remodel with cherry cabinets, Uba Tuba granite, a gas range, and a microwave, Newport Beach
Before: cherry, granite, and gas.
L-shaped kitchen with black ash cabinets, green tile to the ceiling, and a gray work table, by Hybrid Renovations
After: the same L, traded piece by piece.

The owners of this Newport Beach kitchen had no quarrel with its shape. The L worked: the sink under the window, the cooking on the back wall, the refrigerator at the end. What wore on them was what filled it. Dark cherry, speckled granite, a gas range with a microwave hung over it, and a floor that looked busy even when the room was clean. So this kitchen remodel kept the L and traded out the rest, one piece at a time.

Out: the gas range and the microwave. In: induction and a hood

Freestanding stainless gas range under a stainless microwave, cherry cabinets, and a glass mosaic band, before, Newport Beach
Before: a gas range under a microwave.
Black glass induction cooktop with a cream enameled pot under a black ash hood and green vertical tile, Hybrid Renovations
After: induction under a black ash hood.

Induction heats the pan through a magnetic field, so the glass around it stays cooler and a spill wipes off instead of baking on. The cream enameled pot on the cooktop is cast iron under its glaze, which is why it works there. The cooktop sits over a shallow drawer and two deep ones for pots and pans.

Gas out, induction in

  1. Gas capped. The gas line was disconnected back at the supply, capped where it stays reachable, and pressure-tested.
  2. A circuit of its own. A new 240-volt circuit runs from the panel, sized to the cooktop’s spec sheet.
  3. Vented outside. No flame doesn’t mean no steam or grease. The ash hood hides a liner ducted through the roof.
Angel Valle, project manager at Hybrid Renovations

People think the switch to induction is about the cooktop. On site it’s about the panel. We check the electrical service before anything gets ordered, because that circuit decides the rest.

Angel ValleProject Manager

Out: the fridge on its own. In: a paneled fridge and a pantry

Freestanding stainless French-door refrigerator against a tan wall, next to the cherry counter run, before, Newport Beach
Before: a stainless fridge against bare wall.
Panel-ready refrigerator behind black ash doors with nickel pulls, next to a tall pantry cabinet, by Hybrid Renovations
After: ash panels on the fridge, a pantry beside it.

The freestanding fridge gave way to a 36-inch panel-ready refrigerator behind black-stained ash doors, with a tall pantry cabinet beside it. The two read as one tower, floor to ceiling, a short step past the end of the counter run, so the counter ends cleanly and the fridge doors swing clear.

What we found

When the old fridge rolled out, the drywall behind it was soft at the floor. Its ice maker line had been dripping at the fitting, and the bottom plate was stained dark.

What we did

We cut the wet drywall out, let the framing dry, replaced the damp section of plate, and set a recessed water box with its own shutoff for the new refrigerator.

Out: the mosaic band. In: green tile, stacked on end

Tan, bronze, and cream glass mini-brick mosaic between a cherry cabinet and dark granite, before the remodel, Newport Beach
Before: a glass mosaic band.
Glossy green tile in a vertical stack under a glass-door black ash upper, around an outlet, by Hybrid Renovations
After: green tile in a vertical stack.

The old backsplash stopped at the height of the upper cabinets, with tan paint above it. The new tile is a glossy green with a handmade look, long and narrow, standing on end in a vertical stack. It runs from the counter to the ceiling on the window wall and up to the cabinets on the cooking wall. In a stack every joint lines up, so any lean shows across the whole wall. We snapped plumb lines from the corner and the center of the window, and the tile was laid out from those lines.

Every box opened first

Handmade-look tile changes shade from box to box. We opened them all and pulled from several at once, so no stretch of wall ends up one patch of a single shade.

Out: the cabinet by the window. In: a sconce on each side

Stainless double sink and gooseneck faucet in Uba Tuba granite under an almond sliding window, before, Newport Beach
Before: a cherry upper beside the window.
Stainless undermount sink and nickel pull-down faucet under a black window framed in green tile, by Hybrid Renovations
After: tile, a sconce, and a black frame.

The window wall lost its only upper cabinet. The dishes moved to glass-door uppers on the cooking wall, and the window wall got a sconce on each side, on new boxes and their own switch. The window kept its opening; the almond vinyl slider became a black two-pane slider, and the tile returns into the opening with a nickel edge trim.

Below the window, the double sink became one wide stainless undermount bowl with a nickel pull-down faucet, set in warm white quartz. Quartz needs no sealing; a trivet goes under hot pans, since direct heat can mark the resin.

Out: the slate-look tile. In: wide oak planks

Slate-look ceramic floor tile in charcoal, rust, and sage running to cherry base cabinets, before, Newport Beach
Before: slate-look ceramic tile.
Whitewashed wide-plank oak floor running to black ash base cabinets and a gray work table, by Hybrid Renovations
After: whitewashed oak, wall to wall.

The tile came up, and the old thinset was ground off the slab. Before any wood went down, the slab was tested for moisture. The new floor is engineered white oak in wide planks with a whitewashed finish, over the moisture system its maker specifies, glued down before the cabinets went in, so it runs wall to wall under them.

Out: nothing. In: a table

Open slate-look tile floor in front of the cherry L, with nothing in the middle of the room, before, Newport Beach
Before: open floor, nowhere to set a bag down.
Putty-gray work table with a quartz top in the open floor in front of the L, by Hybrid Renovations, Newport Beach
After: a work table with a quartz top.

A built-in island or a table?

Considered

A built-in island with cabinets, outlets, and a quartz top.

Chosen

A freestanding putty-gray work table with a quartz slab top.

Why: An island would have fixed a box in the middle of the room. The table adds a second work surface, keeps the floor open under it, and moves to the wall when the owners have guests.

Out In
Cherry raised-panel cabinets Black-stained ash, glass-door uppers
Uba Tuba granite Warm white quartz
Glass mosaic band Green tile, stacked on end
Gas range and microwave Induction cooktop and ash hood
Freestanding fridge Paneled fridge and pantry
Slate-look tile Whitewashed oak planks
One dome light Recessed lights and two sconces
Cooking wall with cherry cabinets, a microwave over a gas range, and a stainless French-door fridge, before, Newport Beach
Before: the cooking wall.
Cooking wall with glass-door ash uppers, a box hood, and a paneled fridge and pantry tower, by Hybrid Renovations
After: the same wall, every piece new.

Build log

Nine weeks on site, permit to final inspection

  • Before demo

    Panel check and permit. Electrical service checked for the cooktop circuit, permit approved, cabinets and fridge ordered.

  • Weeks 1–2

    Demo and rough-in. Kitchen out, gas capped, wet plate replaced, circuits, hood duct, sconce and light boxes.

  • Week 3

    Inspection and walls. Rough inspection passed, window swapped, drywall closed.

  • Weeks 4–5

    Floor. Thinset ground off, slab tested, boards acclimated, oak glued down.

  • Weeks 6–7

    Cabinets and quartz. Runs and tower set, fridge panels hung, quartz templated and installed.

  • Weeks 8–9

    Tile and finish. Tile, cooktop, hood, sconces, table. Final inspection passed.

Project specs

Cabinets
Black-stained ash, nickel bar pulls, glass-door uppers with knobs
Counters
Warm white quartz
Backsplash
Glossy green tile, vertical stack, to the ceiling at the window
Cooktop
Black glass induction, own 240-volt circuit
Range hood
Black ash box hood, ducted outside
Refrigerator
36-inch panel-ready, ash panels
Pantry
Tall ash pantry cabinet beside the fridge
Sink
Stainless undermount, nickel pull-down faucet
Lighting
Recessed lights, two nickel and ribbed glass sconces
Floor
Engineered white oak, wide planks, whitewashed
View along the sink run past the window to the cooktop and the paneled fridge tower, by Hybrid Renovations, Newport Beach
After: down the sink run to the cooktop and the fridge tower.

The room kept its shape, and every piece inside it changed. The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Costa Mesa, Irvine, and Huntington Beach.

The service behind this project

Looking for a kitchen remodeling contractor in Orange County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

Almost always. An induction cooktop runs on its own 240-volt circuit, sized to the amperage on the maker’s spec sheet, so the first check is whether the panel has room for it. The gas line is shut off and capped, and the switch is done under a permit.

No, only cookware a magnet sticks to: cast iron, enameled cast iron, and most stainless steel. Plain aluminum, copper, and glass won’t heat unless they have a magnetic base. Hold a magnet to the bottom of a pan before you buy new ones.

It’s a refrigerator built to take cabinet panels on its doors, so it matches the cabinets around it. The panels come from the cabinet maker. The opening, the outlet, and the water line are set to the refrigerator maker’s drawing before the cabinets are installed.

Engineered white oak can. Its layered core moves less than solid wood. The slab is tested for moisture first, and the floor goes down over the moisture barrier or glue system the flooring maker calls for, after the boards have sat in the house to acclimate.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project