Kitchen remodel: arched window, plaster hood, cabinets, terracotta floor
Location
Tustin, Orange County
Home type
Single-story 1994 home, U-shaped kitchen under a vaulted ceiling
Timeline
July to September 2026, eight weeks on site
Materials
Sage and cream Shaker, white quartz, terracotta hex, brushed brass
Scope
Demo, window, gas, electrical, cabinets, hood, tile, beams, floors

About This Project

A 1994 Kitchen That Finally Matches the House

Spanish on the outside. 1994 on the inside.

From the street, this Tustin home looks like old California: clay tile roof, smooth stucco walls. The kitchen told the truth about its year. Honey oak cabinets with cathedral doors, white tile counters with gray grout, a vinyl slider over a double sink, and a ceiling fan at the top of the vault. The owners liked the layout. They wanted the room to look like it belonged to the house.

The kitchen before, from the dining side, with honey oak cabinets, tile counters, and a vinyl slider window, Tustin
Before: oak, tile counters, and a slider.
The same kitchen after, with sage and cream cabinets, a plaster hood, and black casements in an arch, by Hybrid Renovations
After: the same U, in the house's own style.
Salvador Lopez, lead project manager at Hybrid Renovations

We kept the sink and range in place and moved the fridge to the end of its run. Then we changed everything your eye lands on, and fixed what was hiding behind it.

Salvador LopezLead Project Manager

Six changes in one corner

Each number has its own section below.

Corner from the arched window to the plaster hood, with white tile, walnut shelves, and a six-burner range, Tustin
  1. The arch. Black casements in a plaster arch, where a vinyl slider was.
  2. An apron sink. White fireclay under a brass bridge faucet with a side spray.
  3. Two cabinet colors. Cream uppers, new on this wall, over sage lowers.
  4. Tile and walnut. Glossy handmade-look tile and two shelves on hidden brackets.
  5. A plaster hood. Troweled plaster over a 36-inch range, vented through the roof.
  6. Beams and a pendant. Stained beams in the vault, and amber glass where the fan hung.

1. The arch over the sink

Close view of the old vinyl slider window above a white tile sill in the original kitchen, before, Tustin
Before: a vinyl slider in a square opening.
Plaster arch and black casement windows under a brass picture light, by Hybrid Renovations, Tustin
After: black casements in a plaster arch.

An arch over a window isn't a drywall trick. Its crown sits higher than the old window's head, so the header above the opening came out and a new one went in higher before anything curved was framed. The casements fill the width the slider did, with dual-pane, low-E glass.

How the new window keeps water out

  1. Cut back the stucco. Six inches around the opening, so the new flashing tucks under the building paper above it.
  2. Pan the sill. A sloped sill pan goes in first, so any water that gets past the window drains back out.
  3. Lap like shingles. Flashing tape on the sides, then the top, each layer over the one below it.
  4. Patch and blend. A three-coat stucco patch, then a color coat over the whole wall so the patch disappears.

2. The apron sink, set before the counters

White fireclay apron sink under a brushed brass bridge faucet with a side spray in white quartz, by Hybrid Renovations
Detail: fireclay, brass, and white quartz.

Fireclay sinks shrink in the kiln, so no two come out exactly the size on the spec sheet. We built the sink base with a support frame inside, set the sink first, and only then had the quartz templated, so the counter is cut to the real sink.

3. Two colors, and uppers where there were none

Three stacked sage green drawers with long brass bar pulls, by Hybrid Renovations, Tustin
Detail: sage drawers, brass bar pulls.

The 1994 kitchen had no upper cabinets on the window wall at all. Now there are uppers on both sides of the arch, with angled cabinets turning each corner. They're cream, so the wall stays bright, over sage lowers with brushed brass bar pulls. LED strips under every upper light the counter.

4. Tile, and shelves that won't sag

The backsplash is a glossy white handmade-look tile in a running bond, from the counter to the uppers and up to the hood. Before any tile went up, we added solid blocking inside the wall for the two walnut shelves beside the hood. Their hidden brackets bolt into wood, not drywall anchors, so a stack of plates won't pull them loose.

5. A plaster hood that actually vents

Old under-cabinet hood and 30-inch range between honey oak cabinets on the range wall, before, Tustin
Before: an under-cabinet hood and a 30-inch range.
Range wall with a plaster hood, glossy white tile, two walnut shelves, and a 36-inch gas range, Tustin
After: a plaster hood over a 36-inch range.

What we found

The drywall box above the old hood held its duct. When we opened it, the duct stopped in the attic, short of the roof. For years the hood had been blowing steam and cooking grease into the insulation.

What we did

We pulled the stained insulation, cleaned the framing, and ran new rigid metal duct from the hood insert straight out through the roof, with a roof cap and a backdraft damper.

Six-burner 36-inch gas range with brass burner caps against glossy white tile, by Hybrid Renovations
Detail: six burners on a larger gas line.

The hood is a steel-stud frame wrapped in cement board, finished in two coats of hand-troweled plaster around a stainless insert. The range grew from 30 to 36 inches. The extra six inches came out of the drawer base beside it, and a new, larger gas line was sized to the new range's rating.

6. Beams in the vault

White ceiling fan with a frosted light kit at the peak of the vaulted kitchen ceiling, before, Tustin
Before: a fan at the top of the vault.
Dark stained beams meeting at the ridge of a vaulted ceiling above an amber pendant, Tustin
After: stained beams and an amber pendant.

The beams are hollow, three-sided boxes of stained wood, mounted on cleats screwed into the ceiling framing. They carry no load; they're there for the eye. The ridge beam hides the pendant's wire, so the fan's old ceiling box feeds the new light without another hole in the vault.

Past the frame: the floor and the dining arch

Old kitchen looking toward a square opening and a carpeted dining room, before, Tustin
Before: vinyl tile and a square opening.
Kitchen looking through a new plaster arch to an oak-floored dining room, by Hybrid Renovations
After: terracotta, and an arch to match the window.
Sealed terracotta hex floor tile in front of sage cabinets and a stainless dishwasher, by Hybrid Renovations
Detail: sealed terracotta hex.

Under the old vinyl, the slab had a hairline crack across the room. A crack-isolation membrane keeps it from showing up in the tile. Raw terracotta drinks grout color, so every tile got sealer before grouting, then more coats after. We tiled under the dishwasher too, so it can still slide out over the thicker floor.

Scope change: oak in the dining room

Once the arch was framed, the owners wanted the dining room's carpet gone too. We laid white oak plank to meet the terracotta at the arch. It added three working days.

Build log

Eight weeks on site, demo to final inspection

  • Before demo

    Order first. Cabinets, casements, and the range were ordered at design sign-off. Demo waited until the cabinets shipped.

  • Week 1

    Demo. Floors protected, a temporary sink in the garage, the kitchen out to the studs. The dead-end duct and the slab crack found.

  • Week 2

    Window and rough-in. Header, casements, flashing, stucco patch. Gas line, circuits, roof duct. Rough inspection passed.

  • Weeks 3–4

    Walls, ceiling, floor. Drywall, the arches, beams, the hood frame. Membrane, terracotta, sealer.

  • Weeks 5–6

    Cabinets and counters. Cabinets and sink set, quartz templated, then installed.

  • Weeks 7–8

    Finish and final. Tile, hood plaster, lights, range, dining room oak. Final inspection passed.

Project specs

Window
Two black casements, dual-pane low-E, in a plaster arch
Range hood
Plaster shell, stainless insert, ducted through the roof
Gas range
36-inch, six burners, on a new, larger gas line
Sink
White fireclay apron-front, brass bridge faucet
Counters
White quartz with a soft gray vein
Cabinets
Shaker, cream uppers and sage lowers, brass bar pulls
Backsplash tile
Glossy white 3x6 handmade-look tile, running bond
Ceiling and lighting
Stained box beams, amber pendant, two can lights
Floor
Terracotta hex, sealed, on a crack-isolation membrane
Dining room floor
White oak plank in place of carpet

The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Irvine, Orange, and Santa Ana.

The service behind this project

Looking for a kitchen remodeling contractor in Orange County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

It starts with a working hood insert: a stainless liner with the fan and filters, ducted outdoors. Around it, the shape is framed in steel studs, wrapped in cement board, and finished in plaster. The plaster is the look; the insert does the venting, and its instructions set the clearances the frame has to keep.

Yes. Casements can usually fill the same opening a slider did. In a stucco wall, the cleanest job cuts the stucco back around the opening, sets a nail-fin window over a sill pan with lapped flashing, and patches the stucco. Retrofit windows skip the cut, but they depend on caulk at the edges to keep water out.

Yes. An apron sink needs a base built for it, with a lower front and a support frame inside, because a fireclay sink can weigh close to 100 pounds before it holds any water. Set the sink before the counters are templated, so the stone is cut to the actual sink.

Seal it before and after grouting. Raw terracotta soaks up water and grout color, so the tiles get a first coat of sealer before any grout goes on. After grouting and cleaning, more coats go on until water beads on the surface. Plan on resealing every few years, depending on traffic.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project