Angelus Paver Front Yard with Rounded Steps and Turf in Long Beach
May 2026
Long Beach
A Long Beach front yard rebuilt from the curb to the door: 2,700 square feet of Angelus pavers, driveway included, 1,300 square feet of TigerTurf, new rounded steps, and solid iron handrails.
Paver walkway, driveway, steps, and walls, plus artificial turf
Location
Long Beach, Los Angeles County
Home type
Two-story brick and stucco home with a covered front porch
Timeline
February 27 to May 18, 2026, about 11 weeks on site
Materials
Angelus pavers and polymeric sand, TigerTurf Diamond Pro Fescue, iron
Scope
Demo, pavers, rounded steps, capped walls, turf, rock, handrails
About This Project
From the Curb to the Front Door
This two-story Long Beach home has a brick porch front, a red door, and, in January 2026, a front yard under black plastic held down by rows of old bricks. The homeowners had hired us once already, for the house itself. This time they wanted the whole front redone: Angelus pavers from the curb to the door, the old concrete driveway paved to match, turf where the lawn had been, and new rounded steps up to the porch.
Before: January 19, the yard under plastic and old bricks.
The Yard, Stop by Stop
Numbered in the order you walk it, from the street.
1
2
3
4
5
6
7
1Parkway pad. Pavers at the curb, in line with the walk.
2Turf. TigerTurf in the yard and the parkway.
3Border band. A charcoal frame set into the walk.
4Capped walls. Planter walls in block that matches the pavers.
5Rounded steps. Two curved steps with lights in the risers.
6Handrails. Solid iron, standing on their own legs.
7Driveway. The old concrete, broken out and paved.
Build log
Four Months, Contract to Walk-Through
Mon, Jan 12
Contract signed Pavers, turf, and the steps changed from square to round.
Fri, Jan 16
Site check 2,702 square feet of pavers and 1,342 of turf, measured.
January
Start held The city closed the street to rebuild it.
Jan 26 to Feb 27
Samples Paver colors, then turf with more brown in the blade.
Fri, Feb 27
Work starts Turf picked the same day.
Tue, Mar 3
Driveway out The old concrete broken out and hauled away.
Mon, Mar 30
Pavers done Walkways, driveway, and planter finished.
Apr 6 to 8
Turf Laid over a base graded March 31.
Thu, Apr 16
Planting White rock and plants finished.
Wed, May 6
Handrails in Two front rails set at the steps.
Mon, May 18
Walk-through Drip system on, final walk-through done.
1. The parkway pad
The walk starts at the curb. The strip between the sidewalk and the street was grass. Now it's turf, with a paver pad in line with the front walk and framed in the same charcoal band, so anyone stepping out of a car lands on pavers. The new tree out there sits in a ring of paver edging filled with white rock.
During: April 8, the pad going in at the curb.
After: the parkway tree in its paver ring.
2. Turf with brown in the blade
Which turf?
Considered
The first round of turf samples.
Chosen
TigerTurf Diamond Pro Fescue, picked on February 27.
Why: The homeowners asked for more brown in the blade. Diamond Pro Fescue has a tan and green thatch under the green, so the yard reads as a lawn, not a carpet.
About 1,300 square feet of it went down April 6 to 8, in the yard and the parkway, with a ring cut for each tree. A band of white rock runs between the turf and the sidewalk on both sides of the walk.
During: April 8, turf going down in the yard and parkway.
3. The walk and its border
The front walk runs straight from the sidewalk, then splits into two curves that wrap the lawns on the way to the steps. A charcoal band runs inside each edge, and where the walk meets the sidewalk, the band turns its corners on a miter.
During: March 24, the border band and its mitered corners.
After: the walk splits into two curves at the steps.
How the pavers went down
1Dig out. The old yard and driveway came out to the dirt.
2Base. Crushed rock spread and compacted under the pavers.
3Edges. Edge restraint staked along every curve, so the pavers can't creep.
4Pavers. Squares and rectangles in mixed sizes, the charcoal band inside the edge.
5Joints. Angelus polymeric sand swept in and wetted, so it sets firm.
4. Walls that match the pavers
The planter walls in front of the house are new, built in block to match the driveway pavers and capped on top. The old flower bed was square; the new wall follows the curve of the walk. Where the pavers meet the house, our own paint crew touched up the stucco afterward.
During: March 26, the capped wall following the curve.
5. Rounded steps
The old porch steps were square. The new ones are round, wider and deeper: two curved steps in the same pavers as the walk, with dark bullnose caps on each tread and lights set into the risers.
Square steps send everyone up the middle. A round step meets you from wherever you walk in: the path, the driveway, or the lawn, so nobody cuts a corner. We made each tread deeper too, so you can stand at the door with your hands full and not feel like you're on a ledge.
Salvador · Project Manager
During: March 24, the caps going on.
After: caps, risers, and step lights.
What we found
Our punch list caught the step lights sitting a little proud of the risers.
What we did
We reset each one flush with the riser face.
6. Handrails on their own legs
Added in April
On April 22 the homeowners added two front handrails to the job, solid iron and powder coated, and we reinstalled the rail at the back of the house. The rails went in on May 6, and on May 15 each one got an extra leg so it stands free of the porch pillars.
After: the scroll end and its legs.
After: a rail on each side of the steps.
7. The driveway
The old concrete driveway was broken out on March 3 and laid in the same pavers as the walk, with the charcoal band curving along the turf. The pavers keep going down the side of the house, for 2,700 square feet in all.
During: polymeric sand on the new driveway.
After: the driveway curving to the steps.
During: the walk down the side yard.
Project specs
Pavers
Angelus, 2,700 sq ft, driveway included
Pattern
Squares and rectangles, tan, terracotta, and brown
Border
Charcoal band, mitered corners
Joints
Angelus polymeric sand
Steps
Two rounded steps, bullnose caps, riser lights
Walls
Capped planter walls to match the pavers
Turf
TigerTurf Diamond Pro Fescue, 1,300 sq ft
Handrails
Two, solid iron, powder coated
Crew
Licensed paver and turf subcontractors, managed by Hybrid Renovations
During: September 2025, the coating job.
The first job at this house
In September 2025 we were here with ladders, not pavers: a COOL LIFE coating on the stucco and wood trim, and two new porch pillars. The gray walls behind the new steps are that job. In January the homeowners called us back for the yard.
Long Beach has plenty of front yards like this one: a lawn on its way out, a concrete driveway, and the steps that came with the house. We see the same yards in Lakewood, Los Alamitos, and Seal Beach, and the same answer works there: pavers and turf from the curb to the door.
If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.
It depends on how much ground there is and what has to come out first. On this Long Beach front yard, work started February 27, and the walkways, the driveway, and the planter were done by March 30: 2,700 square feet of pavers in just over four weeks. The turf took three days in April, and the whole job, with the handrails added along the way, ended with the walk-through on May 18.
Yes. The old slab is broken out and hauled away, the pavers go down over a compacted rock base with edge restraint along the sides, and the joints are filled with sand. On this Long Beach job the concrete driveway came out on March 3 and was laid in the same Angelus pavers as the front walk, so the driveway and the walk read as one surface.
Usually not for the pavers themselves. The City of Long Beach lists private paths and driveways up to 30 inches above the ground next to them, and planters up to four feet tall with no extra load or sloping earth behind them, among the work that needs no building permit. Work past the property line is different: replacing a driveway approach, sidewalk panels, or curb goes through Long Beach Public Works. An HOA can also have rules of its own.
Polymeric sand is joint sand mixed with a binder that sets once it's wetted. The Concrete Masonry and Hardscapes Association calls joint stabilizers optional, but says they cut the sand lost to water, wind, and tires and keep out seeds and insects; it also advises against polymeric sand for topping up old joints. This Long Beach yard was finished with Angelus polymeric sand.
We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.