Hall Bath Remodel with a Sage Tile Walk-In Shower in Irvine
October 2026
Irvine
A hall bathroom remodel in a 2006 Irvine townhome. We kept the window inside the shower and rebuilt the opening around it, hid the toilet tank in a tiled half wall, and laid large-format porcelain.
We scrubbed that shower glass every Saturday, and by Wednesday it was cloudy again. I wanted a shower I could keep clean, and I didn't want to lose the window.
Dana K. · Homeowner, Irvine
This second-floor hall bath in a 2006 Irvine townhome had the feature most remodelers would rather not touch: a window inside the shower. We kept it, and rebuilt everything around it.
Before: espresso, granite, and a framed sliding-door stall.
After: the same spot and the same window, in a new room.
What was thereWhat is there now
Framed sliding doors on a tiled curbA frameless door and a fixed panel on a half wall
A window sill tiled flat, holding waterA sill pitched toward the shower, sealed in
Two-inch stall tile with dark groutWhite hex mosaic sloped to a centered drain
A toilet standing against the shower glassA tiled half wall with the tank inside
Espresso vanity, granite topWhite oak vanity, quartz top
The window stayed. Everything around it changed.
Problem one: a window in the wet zone
A window is where most shower remodels go wrong. The old sill was tiled flat, so every shower left water standing on it. The water found the grout joints and ran into the wall. When the tile came off, the stud under the sill was dark and soft for a foot and a half.
The window itself was a newer vinyl unit with tempered, obscured glass, so it stayed. The opening around it did not.
Before: the window behind hazy framed glass.
After: the same window over frameless glass.
Detail: the niche set below the window.
How we rebuilt the opening
1New wood first. We sistered the damaged stud and framed a new sill that pitches toward the shower.
2One membrane, no gaps. KERDI membrane wraps the whole opening and is sealed to the vinyl frame with KERDI-FIX before any tile.
3Layout from the window. The vertical stack starts at the window's edges, so full tiles frame it instead of slivers.
4Mitered returns. The sides and top of the opening are tiled with mitered edges, with no metal trim and no cut ends showing.
5Tested twice. A 24-hour flood test on the pan and a hose test on the window opening before the first tile went up.
Most people expect us to close up a window in a shower. You don't have to lose the light. You treat the opening like part of the pan: sloped, wrapped, and tested.
Salvador Lopez · Lead Project Manager
Problem two: a toilet that needed a wall
The old stall ran the full width of the back wall, and the toilet stood in front of its glass. The new shower is just as wide, so the toilet needed something solid to stand against that wasn't a door.
Specified for this job
An in-wall tank inside a tiled half wall
The tank hangs on a steel carrier frame bolted to the floor and the studs, hidden in a 42-inch half wall. The bowl sits back against the tile and takes several inches less floor than a tank toilet. The brass flush plate is also the service door: the valves come out through it, so a repair never means opening tile. The wall's quartz cap holds the shower's fixed glass.
Problem three: two-foot tile on a 20-year-old floor
The new floor is 12-by-24-inch porcelain. Tiles that long need a floor flat to within an eighth of an inch over ten feet, and this one dipped three-eighths of an inch beside the old stall. We ground the high spots, poured self-leveling underlayment, and set every joint with leveling clips.
Why the floor joints step by a third
Long porcelain tiles are slightly higher in the middle than at the ends. Offset them by half and the high middle of one tile lands beside the low end of the next, a lip you feel with bare feet. Industry guidance caps the offset at one third for tiles this long, so that is what we used.
Before: two-inch tile, dark grout, mildew at the wall.
After: hex mosaic sloped to a centered drain.
Glass that stays clear
The old glass wasn't dirty. It was etched by hard water, and no cleaner was going to bring it back. The new glass is frameless, with no bottom track to collect scum, and it came with a factory-applied coating that sheds water. A squeegee after each shower keeps it that way.
Before: the bottom track, packed with soap scum.
After: a brass pull and clamp, nothing to scrub around.
The rest of the room
Before: espresso, granite, and a worn mirror.
After: white oak under an arched mirror.
Detail: a three-hole faucet set in quartz.
The granite needed resealing every year; the quartz top doesn't. A light bar over the mirror became a globe sconce on each side at face height, which lights a face from both sides instead of casting shadows down it.
After: two prints by a brass towel bar, where a lone towel bar used to hang.
Build log
Five weeks, demo to final inspection
Week 1
Protection and demo. Dust wall at the door, stairs covered, stall and floor out to the studs. Soft stud found under the window sill.
Week 2
Framing and rough-in. Stud sistered, sill reframed with a pitch, half wall and tank carrier set, new valve and drain. Rough inspection passed.
Week 3
Waterproofing and floor prep. KERDI on the walls, pan, and window opening; flood and hose tests; floor ground and leveled.
Week 4
Tile. Sage tile laid out from the window, hex floor to the drain, 12x24 porcelain on clips.
Week 5
Finish. Vanity, toilet, glass, sconces, and prints. Final inspection passed.
Project specs
Room
About 7 by 9 feet, second floor
Shower
Full width of the back wall, about 3 feet deep
Waterproofing
Schluter KERDI-BOARD and KERDI, sealed to the window with KERDI-FIX
Wall tile
Glossy sage green 3x12 ceramic, vertical stack
Shower floor
Matte white 2-inch hex mosaic, centered square drain
Floor
12x24 limestone-look porcelain, one-third offset
Toilet
Back-to-wall bowl, in-wall tank and carrier, brass dual-flush plate
White oak, slab fronts, quartz top, undermount sink
Lighting
Two brass globe sconces and recessed can lights
The glass still looks new, and the window still brings in the morning light.
Dana K. · Homeowner, Irvine
The finished bath carries our workmanship warranty in writing. We build walk-in showers and bathroom remodels across Orange County, including Tustin, Lake Forest, and Newport Beach.
The service behind this project
Looking for a bathroom remodeling contractor in Orange County?
If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.
Yes, if the opening is built as part of the shower. The sill has to slope toward the shower, the waterproofing has to wrap into the opening and seal to the window frame, and the frame should be vinyl or fiberglass, not wood. California's residential code also treats glass in a shower wall within 60 inches of the shower floor as a hazardous location, so it must be safety glass. This window's glass is tempered and obscured.
Through the flush plate. The plate lifts off, and the fill valve and flush valve come out through the opening behind it, so a repair never means cutting tile. The tank sits in a steel carrier frame bolted to the floor and the framing, and its parts are standard, so any plumber can service them years from now.
No more than one third for tiles with a side longer than 18 inches, unless the tile maker says otherwise. Long porcelain tiles come out of the kiln slightly higher in the middle, and a half offset puts that high middle next to the low end of the next tile. We also check the floor for flatness and set every joint with leveling clips.
Much of Orange County's water is hard, and the white haze on old glass is often etching that no cleaner removes. Frameless glass has no bottom track to trap soap scum, and a factory-applied coating helps water sheet off. A squeegee after each shower does the rest. Ask for the coating when the glass is ordered, since it goes on at the factory.