Kitchen remodel: cabinets, peninsula, gas cooktop, tile, floor, lighting
Location
Anaheim, Orange County
Home type
Single-story 1960s tract home, kitchen last redone in the 1990s
Timeline
June to August 2026, eight weeks on site
Materials
Navy Shaker cabinets, white quartz, glossy white tile, oak
Scope
Permit, gas line, circuits, venting, cabinets, tile, floor

About This Project · 5-minute read

From the Slab to the Ceiling

Honey oak kitchen with gray tile counters, an electric range, and a countertop microwave, before the remodel, Anaheim
Before: honey oak, gray tile counters, and an electric range.

This Anaheim kitchen had been updated in pieces. The floor and the range were about fifteen years old, the oak cabinets and tile counters older than that, and the long sink run simply stopped at an end panel facing open floor. The owners wanted somewhere to set things down and someone to stand across from while they cooked. So this kitchen remodel rebuilt the room in the order its finishes go on: from the slab up to the ceiling.

Layer one: the floor

Long oak sink run under the window with open porcelain tile floor in front of it, before the remodel, Anaheim
Before: porcelain tile and open floor.
Oak plank floor in front of navy cooktop and sink runs, with the side of the new peninsula, by Hybrid Renovations
After: oak planks, with the new peninsula at right.

Keep the porcelain or take it up?

Considered

Keeping the large-format porcelain, still in good shape, and patching around the new cabinets.

Chosen

Taking it up and laying engineered oak planks wall to wall.

Why: The tile was cut to the old cabinets, so the new footprint would have left patches along the old toe-kick line, and tile that old rarely matches a fresh box.

The tile and its thinset came off the slab, and the slab was tested for moisture before any wood went in. The oak was glued down over the moisture barrier its maker calls for, before the cabinets, so it runs under them.

Layer two: the base cabinets

Oak cabinet run ending at an end panel before a sliding door, with open pale porcelain tile floor, before, Anaheim
Before: the run stopped at an end panel.
White quartz counter turning toward the sliding door under oak floating shelves and a navy upper, Hybrid Renovations
After: the counter turns toward the sliding door.

The oak cathedral cabinets came out, and navy Shaker cabinets went in, with bar pulls on the base cabinets and round knobs on the uppers. The sink run now turns the corner and comes back into the room as a peninsula, and its top widens where it leaves the run, so it reads as a counter you face from the room.

Salvador Lopez, lead project manager at Hybrid Renovations

A peninsula is easy to draw and easy to get wrong. We taped its outline on the floor first and had the owners walk the aisle with the oven door open. If the tape is in the way, the cabinets will be too.

Salvador LopezLead Project Manager

Layer three: the counter

Stainless electric range under a slim hood, a microwave on the tile counter, and honey oak uppers, before, Anaheim
Before: an electric range and a slim hood.
Five-burner gas cooktop over a built-in oven, a stainless chimney hood, and navy uppers, by Hybrid Renovations, Anaheim
After: a gas cooktop with an oven under it.

The tile counters gave way to white quartz with soft gray veins, cut as one layout across all three runs. The electric range made room for a five-burner gas cooktop set into the quartz, with a built-in oven in the cabinet under it.

Electric out, gas in

  1. A gas line. A new line runs to the cooktop, sized for every gas appliance it shares a line with, with a shutoff valve in the next base cabinet.
  2. Tested. The line was pressure-tested and inspected before the walls closed.
  3. The oven's circuit. The old range circuit was checked against the oven's spec sheet and now feeds the built-in oven.
White double drop-in sink in gray tile counters under a two-pane sliding window, before the remodel, Anaheim
Before: a double drop-in sink in tile.
Stainless undermount sink and pull-down faucet in white quartz under a white double-hung window, Hybrid Renovations
After: a stainless undermount bowl in quartz.

A drop-in sink suits tile because its rim sits on top. Quartz is solid, so the new stainless sink hangs underneath it, and a wipe goes straight into the bowl. It never needs sealing, but hot pans still go on a trivet: direct heat can scorch the resin.

Layer four: the wall

Sink wall with honey oak uppers on both sides of a sliding window and one row of gray tile, before, Anaheim
Before: one row of tile, uppers on both sides.
Sink wall with glossy white tile from the counter to the ceiling, oak shelves, and a navy upper, by Hybrid Renovations
After: white tile from the counter to the ceiling.

One row of gray tile became glossy white tile laid in a straight stack from the counter to the ceiling. The window kept its opening; the two-pane slider became a white double-hung window with its own trim, and the two-door upper on its left came down, so the tile runs from the window to one navy upper in the corner.

Outlets brought out to the tile

Tile adds thickness to the wall. Every outlet and switch box got an extension ring, so the devices sit flush with the tile face instead of sunk behind it.

Layer five: shelves and uppers

Honey oak upper with brass knobs on its doors, to the right of the sliding window, before the remodel, Anaheim
Before: a three-door oak upper.
Two oak floating shelves with glass jars and a potted basil beside a navy upper on white tile, Hybrid Renovations
After: two oak shelves and one navy upper.

Where a three-door upper hung, two oak floating shelves now sit beside one navy upper at the corner where the counter turns. Floating shelves only look like they float: before the drywall closed, we added blocking between the studs, and each shelf's hidden bracket is screwed into it.

Layer six: the ceiling

Slim stainless hood over a black glass electric cooktop with a square gray tile panel behind it, before, Anaheim
Before: a slim hood over the electric range.
Stainless chimney hood over a gas cooktop, with white stacked tile and a crock of wooden spoons, Hybrid Renovations
After: a chimney hood, ducted outside.

The slim hood gave way to a stainless chimney hood, its duct run through the attic and out the roof at the size the hood maker calls for. The fluorescent box in the middle of the ceiling came down, and a drum light and recessed lights went up in its place.

What we found

Behind the fluorescent box, the ceiling wiring was spliced in the open, with no junction box around it.

What we did

We set a proper ceiling box for the new drum light, made every splice inside a box, and ran the recessed lights on their own switch.

Navy Shaker kitchen with white quartz, white tile to the ceiling, a chimney hood, and a new peninsula, by Hybrid Renovations
After: every layer at once, from the oak floor to the drum light.

Build log

Eight weeks on site, permit to final inspection

  • Before demo

    Layout and permit. Peninsula taped on the floor, permit approved, cabinets and appliances ordered.

  • Weeks 1–2

    Demo and rough-in. Kitchen and tile out, gas line, circuits, hood duct, ceiling boxes, shelf blocking.

  • Week 3

    Inspection and walls. Gas test and rough inspection passed, window swapped, drywall closed.

  • Week 4

    Floor. Slab tested, boards acclimated, oak installed.

  • Weeks 5–6

    Cabinets and quartz. Runs and peninsula set, quartz templated and installed.

  • Weeks 7–8

    Tile and finish. Tile, cooktop, oven, hood, shelves, lights. Final inspection passed.

Project specs

Cabinets
Navy Shaker, bar pulls below, round knobs above
Peninsula
Off the sink run, wider where it turns
Counters
White quartz with soft gray veins
Backsplash
Glossy white tile, straight stack, counter to ceiling
Cooktop
Five-burner gas, new gas line
Oven
Built-in, under the cooktop
Range hood
Stainless chimney hood, ducted outside
Sink
Stainless undermount, pull-down faucet
Shelves
Two oak floating shelves on hidden brackets
Floor
Engineered oak planks
Stainless side-by-side refrigerator in an oak surround beside the oak base run and the microwave, before, Anaheim
Before: a side-by-side in an oak surround.
Stainless French-door refrigerator in a navy surround with a cabinet above, beside the cooktop run, Hybrid Renovations
After: a French-door fridge in navy.
Undermount sink in white quartz under a double-hung window, with two oak shelves to its right, by Hybrid Renovations
After: the undermount sink under the double-hung window, shelves to its right.

Six layers of finishes, laid from the floor up once the rough-in was closed in. The kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Fullerton, Orange, and Garden Grove.

The service behind this project

Looking for a kitchen remodeling contractor in Orange County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

Often, yes. A peninsula turns off the end of a counter run, so it needs open floor beside that run and a clear walkway around its end. Base cabinets go in first, then the counter is templated across the whole L so it can be cut as one layout.

A gas line to the cooktop, sized for every gas appliance on that line, with a shutoff valve you can reach, a pressure test, and a permit and inspection. A built-in oven under the cooktop still needs its own electrical circuit.

Usually not. An undermount sink hangs from the underside of a solid top, so it suits quartz or stone. Tile counters usually take a drop-in sink with a rim that sits on top.

Engineered oak can. The slab is tested for moisture first, and the boards go down over the moisture barrier or glue system the flooring maker calls for, after they have sat in the house to acclimate.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project