White Shaker Kitchen Remodel with a Navy Peninsula in Fountain Valley
September 2026
Fountain Valley
A kitchen remodel in a 1978 Fountain Valley home whose back wall folds three times. White Shaker, floating oak shelves, a 36-inch gas range, a farmhouse sink, and a new navy peninsula replaced maple and granite.
Kitchen remodel: new peninsula, cabinets, tile, gas range, oak floor
Location
Fountain Valley, Orange County
Home type
Single-story 1978 tract home, kitchen in a bay with angled walls
Timeline
July to September 2026, eight weeks on site
Materials
White Shaker, navy Shaker, white quartz, white oak, fireclay
Scope
Demo, gas line, duct, electrical, cabinets, counters, tile, floors
About This Project · 5-minute read
A Kitchen With No Square Corners
Set a framing square in any corner of this Fountain Valley kitchen, and it won’t sit flat. The back of this 1978 tract home ends in a bay: the walls fold in twice, then back out once. Stock cabinets, straight tile, and square-cut counters all expect 90 degrees, and this bay doesn’t have one. So we’ll tell this kitchen remodel the way we built it: one corner at a time.
Four walls, three bends
Same walls, windows, fridge, sink, and range spots. Gray stayed. Blue is new.
BeforeAfter
1First bend. The range wall turns toward the first window.
2Second bend. A narrow stretch of wall between the windows.
3Third bend. It folds back out, past the sink wall.
4The peninsula. New, from the third bend toward the dining area.
The owners liked the layout. The fridge, range, sink, and dishwasher stayed on their walls, and both windows kept their openings. They wanted gas under their pots, somewhere to sit, and a kitchen that stopped looking like 2004.
Every corner here needed a different answer. Two fold in and one folds out, so nothing you order comes ready to fit. You measure it, you draw it, and then you measure it again.
Joseph Canchola · Project Manager
The first bend: six more inches of range
Before: maple uppers and a microwave over a 30-inch electric range.
After: floating oak shelves, a box hood, and a 36-inch gas range.
Six burners need 36 inches, and the old range had 30. The extra width came out of the unit beside the corner, which shrank to one narrow door, and a tapered filler scribed to the wall closes the wedge.
What we found
An electric kitchen has no gas to tap. The nearest line fed the water heater in the garage, on a branch too small for six burners.
What we did
We ran a new 3/4-inch line from the meter through the attic, pressure-tested it for the inspector, and put a shutoff in the next cabinet. The 240-volt range circuit came out, and a 120-volt outlet now runs the igniters.
The microwave above the old range only recirculated its air. It came down, and the new hood vents through the roof, its white box hiding a steel liner and the fan.
Detail: three shelves between the fridge cabinet and the hood.
Floating white oak shelves replaced the wall cabinets. Each hangs on steel brackets lagged into studs and blocking added while the wall was open; the tile went on around them, and the oak slid on last.
The second bend: where the tile starts
Before: a silver slider, granite, and diagonal beige tile.
After: a black frame in the same opening, and the same olive tree.
White 2-by-8 tile, stood on end in a straight stack, runs from counter to ceiling. A staggered pattern forgives small errors. A straight stack shows them, because every joint runs the full height of the wall.
How a straight stack gets around a bend
1Start at the second bend. The wall between the windows is the narrowest stretch, where slivers show most. The layout centers there and works outward.
2Shoot one level line. A laser runs around the whole bay, so every row meets itself at each bend.
3Match the cuts. Tile on both sides of a bend is cut to the same width, so the corner looks planned.
4Caulk the corners. Walls move on their own, and grout in an inside corner cracks. The tile industry’s movement-joint standard calls for flexible sealant, so we use matching silicone.
Both windows got black frames in their old openings, so the stucco outside was never touched. Can lights and two dome pendants replaced the ceiling fan, wired from the attic.
The sink wall: build around the real sink
Before: a double sink in granite under the second window.
After: a fireclay farmhouse sink, the dishwasher in the same slot.
Detail: a matte black faucet over the fireclay sink.
Fireclay sinks can come out of the kiln a little off their spec sheet, so the real sink came to the job first. We cut down the base cabinet, built a frame inside to carry the weight, and set the sink before the quartz fabricator came to template.
The third bend: the corner that folds out
This bend turns the other way. The tile stops here, and painted wall and three more oak shelves take over. It’s also where the kitchen finally got a place to sit.
Before: a side-by-side fridge, open floor, and nowhere to sit.
After: the peninsula, from the third bend toward the dining area.
Island or peninsula?
Considered
A freestanding island, which the owners had saved photos of for years.
Chosen
A peninsula tied to the wall at the third bend.
Why: It asks for walkway on fewer sides, and its outlets get power through the wall, with no trench across the slab.
Detail: navy Shaker on both long sides, from the family room.
Detail: two stools under the oak overhang.
The top is thick white oak butcher block, and wood moves with the seasons, so screws in slotted holes let it slide without splitting. A sealant joint separates it from the quartz. Steel plates carry the 15-inch overhang at the end, the knee room kitchen guidelines ask for at counter height.
The floor: one direction through every angle
Before: dark laminate and a side-by-side fridge.
After: wide-plank white oak and a French-door fridge in the same spot.
The laminate came up, and the slab passed a moisture test. Engineered white oak went down next, through the dining area, every plank running with the range wall. It’s the one thing in this kitchen that never had to think about the bends.
Build log
Eight weeks on site, drawing to final inspection
Before demo
Measure and order. Every bend drawn to scale. Demo waited for the cabinets.
Week 1
Demo. A temporary kitchen in the family room. Maple, granite, and laminate out.
Week 2
Rough-in. Gas line, roof duct, circuits, can lights. Rough inspection passed.
Weeks 3–4
Walls and floor. Drywall, blocking, black frames, moisture test, white oak down.
Weeks 5–6
Cabinets and counters. Cabinets, peninsula, sink. Quartz templated and set, oak top fastened.
Weeks 7–8
Tile and finish. Tile, shelves, hood, appliances, lights. Final inspection passed.
Project specs
Cabinets
White Shaker, matte black bar pulls
Peninsula
Navy Shaker, white oak butcher block top, seats two
Counters
White quartz
Backsplash
White 2-by-8 tile, straight stack, to the ceiling
Range
36-inch stainless gas, six burners
Range hood
White box, oak band, vented through the roof
Shelves
Floating white oak on steel brackets
Sink
White fireclay farmhouse, matte black faucet
Windows
Black frames, existing openings
Floor
Wide-plank engineered white oak
The finished kitchen carries our workmanship warranty in writing. We handle kitchen remodels across Orange County, including Huntington Beach, Westminster, and Garden Grove.
The service behind this project
Looking for a kitchen remodeling contractor in Orange County?
If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.
A peninsula connects to a wall or a run of cabinets at one end, and an island stands free. That one connection matters. A peninsula needs walkway on fewer sides, so it fits rooms that can’t keep clear aisles all the way around, and it can take its power through the wall it’s tied to. Around either one, the National Kitchen and Bath Association’s guidelines call for a 42-inch work aisle for one cook and 48 inches for two.
A base cabinet cut down for the apron, a support frame inside it, and the sink itself on site before anything is finalized. Fireclay sinks are heavy, and firing in a kiln means one can differ from its spec sheet, so the countertop gets templated from the real sink, not the drawing. Check the maker’s install sheet for the cabinet size and support it asks for.
From underneath, with screws through slotted or oversized holes, so the top can slide as the humidity changes. Don’t glue it down or fasten it tight: wood that can’t move can split, and some makers won’t honor a warranty on a top installed that way. Support any long overhang too. John Boos, for one, asks for brackets past 8 inches.
Yes, if the brackets go into something solid. Plates and bowls add up fast, so steel brackets should be lagged into studs, or into blocking added while the wall is open. Drywall anchors alone won’t carry them. Check the bracket maker’s load rating, and plan the shelves before the tile goes up, so the hardware sits behind it.
We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.