Hall bathroom remodel, tub kept, navy beadboard wainscot
Location
Torrance, Los Angeles County
Home type
Two-story 1986 tract home, hall bath on the second floor
Timeline
August to September 2026, 19 working days on site
Materials
Beveled subway tile, Carrara marble, PVC beadboard, polished nickel
Scope
Demo to studs, framing repair, new valve and tub, tile, glass, window

About This Project

What the Old Tile Was Hiding

This hall bath on the second floor of a 1986 Torrance home looked tired, not broken: sage paint, an espresso vanity, and a tub wrapped in beige tile. The family wanted it brighter and easier to keep clean, and they wanted to keep the tub, the only one in the house. Most of the real work turned out to be behind the tile.

19 Working days on site
3 ft Of rotted wall plate replaced
120°F Hot water limit on the new valve
0 Cuts to the outside stucco
Navy beadboard hall bath with a white Shaker vanity, a shuttered window, and a glass-paneled subway tile tub, Torrance
After: the same tub, window, and doorway, in a new room.
Hall bath before the remodel with sage walls, an espresso vanity, black granite, and a beige tile tub surround, Torrance
Before: sage, espresso, and beige tile.

The brief

Two young kids meant the tub stayed. Everything else was open: a lighter room, nothing to scrub around, and storage that closes. A mid-2000s update had stopped at the vanity. The tub, its tile, and its 1980s valve were all original.

Day two: the wall behind the tub

Close view of the old tub corner, where cracked caulk, mildew, and rust stains met beige tile, before the remodel, Torrance
Before: cracked caulk, the leak's way in.

The first sign was the corner where the tile met the tub. The caulk had cracked years earlier, and every shower pushed a little water through it. Behind the tile was paper-faced greenboard, soft as wet cardboard, and a bottom plate that crumbled under a screwdriver.

What we found

Three feet of rotted bottom plate, mold on the back of the greenboard, and a slow drip from the old valve's diverter stem. Under the tub, an earlier plumber had notched a floor joist almost halfway through to fit the drain.

What we did

We replaced the plate, sistered a full-length joist to the notched one, and let the framing dry out before closing anything. The greenboard went to the dump: it isn't allowed behind tile around a tub anymore.

Scope change: one more day for the floor

The notched joist wasn't in the plan. We stopped, showed the family, and had the repair inspected before the new tub went in. It added one working day.

Three handles, no scald protection

Original 1980s three-handle chrome shower valve with clear knobs on beige 6x6 tile above the tub, before, Torrance
Before: hot, diverter, and cold, all original.
Brushed nickel shower head, pressure-balance valve, and tub spout on white beveled subway tile by Hybrid Renovations
After: one pressure-balance valve.
Recessed shower niche lined in Carrara marble with pump bottles on two shelves, by Hybrid Renovations, Torrance
Detail: the niche, in an inside wall.

The old valve had a handle for hot, one for cold, and a third to send water to the head. Nothing in it could stop a flushing toilet from turning the shower scalding. California's plumbing code requires a pressure-balance or thermostatic valve whenever one is replaced, so we cut it out instead of putting new handles on old parts.

Set and tested at 120°F

A pressure-balance valve holds the mix steady when the cold pressure drops. We set its limit stop so the water can't run hotter than 120°F, then checked it with a thermometer at the spout.

Joseph Canchola, project manager at Hybrid Renovations

You can't make a three-handle valve safe by changing the handles. The protection lives in the valve body, inside the wall. Once the wall was open, leaving it there was never an option.

Joseph CancholaProject Manager

A shower without a curtain

Subway tile tub alcove framed by navy beadboard, with a marble-lined niche and a fixed glass panel, by Hybrid Renovations
After: subway tile to the ceiling and a fixed glass panel.

The new 60-inch tub sits in a mortar bed, so its floor doesn't flex and pull at the caulk. Cement board and two coats of liquid membrane went up behind the tile, lapped over the tub's flange. The beveled subway tile runs to the ceiling, laid out so the top row is a full tile, not a sliver.

The niche is framed into the inside wall, never the outside one, so the insulation stays whole, and its shelves slope toward the tub.

Nickel glass hinge on beveled white subway tile beside the tub spout, with the navy beadboard edge, by Hybrid Renovations
Detail: a hinge clamp and the seal on the tub rim.

Glass measured after tile

A fixed panel covers the half of the tub where the spray lands, with no track or curtain to clean. We measure glass only after the tile is set, because tile adds thickness no drawing shows. The corners and the joint at the tub got color-matched silicone, not grout, so they can move without cracking.

Beadboard that can live in a bathroom

Old vanity wall with sage paint, an espresso Shaker vanity, black granite, and an amber three-light bar, Torrance
Before: sage paint on a bare wall.
Full vanity wall with navy beadboard wainscot, a white Shaker vanity, a Carrara top, and globe sconces, Torrance
After: navy beadboard wainscot.

What should the wainscot be made of?

Considered

Wood or MDF beadboard, the usual choice

Chosen

Cellular PVC beadboard and cap rail

Why: Steam swells wood and MDF at the seams within a few years. PVC doesn't absorb water, and it takes a satin enamel that wipes clean.

Polished nickel widespread faucet over an undermount sink in Carrara marble, with navy beadboard and a fern, Torrance
After: a widespread faucet in Carrara marble.
White inset Shaker vanity drawers with polished nickel bar pulls over a striped runner by Hybrid Renovations, Torrance
After: inset Shaker drawers with bar pulls.

The 60-inch inset Shaker vanity has drawers at both ends, with a pair of doors under the sink. Two globe sconces at face height, one on each side of the mirror, replaced a light bar above it.

A window you can see out of

Old sliding window with frosted privacy glass on a sage wall beside the toilet, before the remodel, Torrance
Before: frosted glass and no view.
Window with white plantation shutters over navy beadboard wainscot beside the vanity's far end and a fern, Torrance
After: clear glass behind plantation shutters.

The old slider had frosted glass for privacy, and the family missed the palms outside. The new vinyl window went in as a retrofit, inside the old opening, so the stucco outside was never cut. It sits within five feet of the tub, so its glass is tempered, as the code requires. Shutters handle privacy now: louvers closed for a bath, open for the morning light.

Build log

19 working days, demo to final inspection

  • Week 1

    Protection and demo. Floor and stairs covered, dust wall at the door. Tile, tub, and vanity out. Rotted plate and notched joist found.

  • Week 2

    Repairs and rough-in. Plate replaced, joist sistered, new valve and drain. Framing and plumbing inspected.

  • Week 3

    Waterproofing and tile. Tub set in mortar, cement board and membrane, subway tile and niche, floor tile.

  • Week 4

    Finish. Window, beadboard, vanity, sconces, and paint. Glass measured.

  • Week 5

    Glass and final. Fixed panel installed. Final inspection passed.

Project specs

Room
About 8 by 10 feet, second floor
Tub
60-inch acrylic alcove tub, set in a mortar bed
Valve
Pressure-balance, limit stop at 120°F, brushed nickel trim
Tub walls
Cement board, liquid membrane, white beveled 3x6 subway tile
Niche
Inside wall, two shelves, Carrara marble lining
Glass
3/8-inch tempered fixed panel, two brushed nickel hinges
Wainscot
PVC beadboard and cap rail, navy satin enamel
Vanity
60-inch white inset Shaker, Carrara top and backsplash
Floor
12x24 marble-look porcelain
Window
Vinyl retrofit, tempered glass, plantation shutters
Hall bath looking back to the pocket door, past a white robe on a hook and the marble-topped vanity, by Hybrid Renovations
After: looking back toward the pocket door.

The finished bath carries our workmanship warranty in writing. We handle bathroom remodels that keep the tub across the South Bay, including Redondo Beach, Gardena, and Lomita.

The service behind this project

Looking for a bathroom remodeling contractor in Los Angeles County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

You don't have to, but a remodel is the time to do it. A new or replacement shower valve in California has to be pressure-balance or thermostatic, with a limit stop set no higher than 120°F. A three-handle valve has neither, and new handles can't add them, because that protection lives inside the valve body. With the tile already off, the swap is a small part of the job.

Yes, if it's made for a wet room. We use cellular PVC beadboard and cap rail, which don't absorb water, keep it out of the tub's splash zone, and finish it in a satin enamel that wipes clean. Wood and MDF beadboard tend to swell at the seams once a bathroom's steam gets to them.

Usually, yes. California's residential code treats glass within 60 inches of a tub's edge as a hazardous location when its bottom edge is less than 60 inches above the floor or the tub's standing surface. Glass in that zone must be tempered or another safety glass, and a replacement window has to meet the same rule. A window placed higher or farther away can use ordinary glass.

Usually because the tub moves. A tub flexes a little when it fills and someone steps in, more so when it sits without a mortar bed or solid support. Grout and hard caulk can't stretch that far, so the joint cracks, and every shower then pushes water into the wall. Setting the tub in mortar and using flexible silicone at that joint prevents it.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project