Small Bathroom Remodel with a Curbless Shower in Costa Mesa
August 2026
Costa Mesa
A five-by-eight hall bath in a 1962 Costa Mesa home, rebuilt for a family of four. We lowered the slab for a curbless shower, hung the toilet on the wall, floated the vanity, and traded a swinging door for a slider.
Demo to slab, slab and drain work, tile, glass, vanity, toilet, fan
About This Project
Forty Square Feet, Measured in Inches
The hall bath in this 1962 Costa Mesa home is five feet wide and eight feet long, and a family of four shares it. Nothing in it was broken. It just didn't fit. Open the shower door and it stopped two inches short of the toilet. Step out and there was a four-inch curb under your foot. They didn't want a bigger room. They wanted this one to work.
Before: a 1990s update, everything standing on the floor.
The brief
What the family asked for, July 2026
Keep the walls, the window, and the doorway where they are
A shower with nothing to step over
Nothing that swings into the room
Storage for four people, off the floor
A floor you can mop in one pass
So we measured the room the way the family moves through it, in inches, and went after them one at a time.
22 inches: the shower door
After: a slider that never leaves its track.
California's plumbing code says a hinged shower door has to swing out, into the room. In this room, out meant over the toilet. We replaced the framed enclosure with a fixed panel and a sliding door on one round bronze bar. The opening still clears the code's 22-inch minimum, and the door never moves past its own footprint.
4 inches to zero: the curb
Before: a curb and a center drain.
After: one floor, one linear drain.
A curbless shower in a slab house means cutting concrete. We saw-cut the slab inside the shower, broke it out, and poured it back an inch and a half lower, so the sloped floor and its waterproofing finish flush with the bathroom floor. Taking the old curb apart is where the surprises started.
What we found
Whoever built the curb had nailed its framing straight through the shower liner. For years, a little water slipped through those nail holes, and 18 inches of the wall's bottom plate beside it had gone soft.
What we did
We cut out the rotted plate, set a new pressure-treated one on a sill gasket, and ran a fan on the slab for two days before anything new went down.
Under the slab: the pipe nobody could see
Trenching for the new drain exposed the original cast-iron line. Our camera showed its bottom eaten through, a common failure under 1960s slabs. We replaced it with ABS out to the main line. It added two working days and its own inspection.
A center drain makes the floor slope four ways at once, so you're stuck with little mosaic tile. Put the drain along one wall and the floor tilts one way, like a gentle ramp. Then a 24-inch tile lies flat, and the same floor runs right into the shower.
Angel Valle · Project Manager
With no curb, the whole floor is the backup
The membrane doesn't stop at the glass. It covers the entire bathroom floor and runs three inches up every wall, and the shower floor tilts away from its open edge, toward the drain.
6 inches: the toilet
Before: 29 inches into the room.
After: 21 inches, and open underneath.
A wall-hung bowl reaches eight inches less into the room than the old two-piece toilet, but its tank and steel carrier live inside the wall, and this wall was only 2x4 deep. We furred it out two inches and bolted the carrier to the slab, so the room still came out six inches ahead. The code wants 24 inches clear in front of the bowl; this one has room to spare.
3 inches: the vanity
Before: 21 inches deep, on a toe kick.
After: 18 inches deep, off the floor.
Detail: a sink molded into the top.
Shallower, and floating
The new vanity hangs on 2x10 blocking we added in the wall, so the floor runs underneath it and the room reads wider than it is. Its top is one piece of solid surface with the sink molded in, so there's no rim to wipe around.
Before: the trap owned the cabinet.
After: a drawer notched around it.
Under the old sink, the plumbing took the middle of the cabinet and everything else lived on its floor. The new top drawer has a U-shaped notch that wraps the trap, so it still pulls out full depth.
After: four mirror doors and a lit shelf.
Storage at eye level
A mirror cabinet four doors wide replaced the single medicine cabinet. Under it, a warm LED strip lights an open shelf for the things you reach for every morning.
One wall for the niche
After: the niche, under the original window.
We keep niches out of outside walls, because the recess takes the space the insulation needs. In a shower this small, though, the side walls are short and the left one holds the valve. The window stayed: we found the tempered stamp in its corner and sealed it into the new membrane.
Where do four people's bottles go?
Considered
A corner shelf or a hanging caddy
Chosen
A lit niche in the outside wall, under the window
Why: We backed it with rigid foam and wrapped it inside the waterproofing. Nothing hangs off the glass or crowds your elbows.
After: looking back to the door, nothing in the walkway.
22 inOf door swing, gone
0 inOf curb to step over
6 inMore floor at the toilet
3 inMore walkway at the vanity
Build log
21 working days, demo to final inspection
Week 1
Protection and demo. Dust wall at the door, the room taken down to studs and slab. Liner nails and the soft plate found.
Week 2
Slab and plumbing. Shower slab lowered, cast-iron line replaced, carrier and linear drain set. Plumbing inspected.
Week 3
Framing and waterproofing. New plate, furred wall, blocking, niche, and fan. Sloped bed, then membrane over the whole floor.
Week 4
Tile and finish. 24x24 floor tile, 24x48 walls, vanity, cabinet, and paint. Glass measured.
Week 5
Glass and final. Sliding glass installed. Final inspection passed.
Project specs
Room
About 5 by 8 feet, hall bath, slab floor
Shower floor
Slab lowered 1 1/2 inches, one-way slope, linear drain
Waterproofing
Liquid membrane on the whole floor and the shower walls
The finished bath carries our workmanship warranty in writing. We plan small bathroom remodels like this one across Orange County, including Newport Beach, Huntington Beach, and Fountain Valley.
The service behind this project
Looking for a bathroom remodeling contractor in Orange County?
If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.
By opening the slab over the damaged run. A camera inspection shows where the cast iron has rotted or cracked. We saw-cut and trench the concrete along that stretch, replace the pipe with ABS back to sound pipe or the main line, have it inspected, and pour the slab back. Under a bathroom being remodeled, the floor is already open, so it is the easiest time to do it.
Usually several inches, because the tank hides inside the wall. On this job the bowl reaches eight inches less into the room than the old two-piece toilet. The wall has to be deep enough for the tank and its steel frame, so a 2x4 wall gets built out, and that thickness comes off the gain.
In a tight room, usually yes. California's plumbing code requires a hinged shower door to open outward, so it needs clear floor in front of it, and in a small bath that floor is often where the toilet sits. A sliding door stays in its own track, and the opening still has to be at least 22 inches wide.
Yes, and they often help, because fewer grout lines make a room read bigger. On a shower floor, large tiles need a floor that slopes in one direction, which a linear drain allows. A round center drain slopes the floor four ways, so it needs small mosaic tile to follow the slope.
We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.