Small Hall Bath Remodel Under a Skylight in Laguna Niguel
September 2026
Laguna Niguel
A 5-by-8 hall bath in a 1986 Laguna Niguel home. We kept the footprint and the skylight opening, then rebuilt the room around the daylight with a fixed glass panel, built-in storage, and a floating vanity.
Small hall bath remodel: skylight, tub-shower, built-in storage, vanity
Location
Laguna Niguel, Orange County
Home type
Single-story 1986 home, 5-by-8 hall bath under a skylight
Timeline
August to September 2026, 17 working days on site
Materials
White square tile, white oak, white quartz, brushed brass, honed marble
Scope
Demo, skylight, waterproofing, plumbing, tile, storage, vanity, fan
About This Project
A Small Bath Built Around Its Skylight
The hall bath in this 1986 Laguna Niguel home measures 5 by 8 feet, with a tub across the far wall and a skylight above it. Everything else was original: a pale blue tile band, pebbled sliding doors, a laminate vanity, and a strip of five bulbs over a mirror box. The owners asked for a room that feels bigger without moving a wall, and they wanted to keep the daylight.
Before: the 1986 room, seen from inside.
Eight things to look for in the finished room
Each number marks one choice that makes a small bath feel bigger.
1
2
3
4
5
6
7
8
1Skylight. Flat glass in the old opening, over an insulated, re-lined shaft.
2Fixed glass panel. One panel over the shower half, so there's no track on the tub rim.
3Long niche. One shelf across the whole tub wall, low enough for kids to reach.
4Shower trim. Valve, spout, and a handheld on a slide bar, all behind the glass.
5Recessed shelves. Three shelves inside a wall that used to hide a vent pipe.
6Medicine cabinet. Set into the wall, with one globe sconce in place of five bulbs.
7Floating vanity. A 30-inch white oak vanity, with the floor running under it to the wall.
8Marble floor. Honed 2-inch hexagons, with enough grout lines to keep wet feet steady.
In a room this size you can't add floor, so you clear it. Anything that used to stick out into the room now sits inside a wall, hangs off one, or is glass you can see straight through.
Joseph Canchola · Project Manager
Daylight through the old opening
Before: a plastic bubble dome.
After: flat glass and a re-lined shaft.
The skylight stayed, but the bubble dome did not: on cool mornings it dripped condensation into the tub. A new unit sized to the old rough opening meant no new roof framing and the same patch of daylight.
What we found
From the attic, the shaft's walls were bare drywall with no insulation, so warm, wet air from the shower met a cold surface on its way up. The roof deck around the old curb was stained but still solid.
What we did
We set a deck-mounted skylight with insulated, laminated glass, new step flashing, and an underlayment collar. The shaft got insulation on its attic side and fresh drywall and paint inside.
Scope change: a fan that vents outside
The old exhaust fan blew straight into the attic. We ducted a quiet new fan through the roof, on a humidity sensor, so it clears the steam that used to collect in the shaft. It added one working day.
A panel instead of sliding doors
Before: chrome sliders and pebbled glass.
After: one fixed panel over the shower half.
Doors, a curtain, or a panel?
Considered
New frameless sliding doors on a track
Chosen
One fixed tempered glass panel over the shower half
Why: A track on the rim holds water and grime, and a curtain hides half the room. A fixed panel keeps the spray in and leaves the far end open for bathing kids.
The panel hangs on two clamps in the end wall, so we set solid blocking between the studs before the backer board went up. We templated the glass only after the tile was grouted: on a wall this short, an eighth of an inch shows.
Tile, a niche, and a handheld
Behind the old tile
The 1986 tile was set on moisture-resistant drywall, and around the valve it had gone soft. Every tub wall came down to the studs. The new walls are cement board under a bonded membrane that laps over the tub's flange.
After: one niche, the tub's full width.
One long niche
The niche spans the back wall between the studs, sized to the 4-inch tile so every edge lands on a grout line. Its sill tips toward the tub, so water never sits on it.
Detail: handheld, valve, and spout.
Everything on the end wall
The valve, spout, and slide bar share the end wall behind the fixed glass, so the spray stays on the glass side of the tub. The slide bar sets the handheld at any height, for a toddler's rinse or a tall adult's shower.
Storage inside a wall that was already there
Before: a towel bar on a plain wall.
After: three recessed shelves.
The wall behind the toilet stands out from the vanity wall: a chase the builder framed around the vent pipe. When we opened it, the vent ran up one corner and the rest was hollow. We shifted the pipe 4 inches with two 45-degree fittings, and the hollow became three shelves, each deep enough for a rolled bath towel.
A vanity wall that gives back floor
Before: a laminate cabinet and a mirror box.
After: floating oak and a recessed cabinet.
The old vanity stood on the floor, and its doors swung into the path to the toilet. The new 30-inch white oak vanity hangs on blocking we added between the studs, and its two drawers pull straight out. With the floor running under it to the wall, the room looks wider from the doorway than it measures.
After: one sconce over a recessed cabinet.
Detail: drawers, brass pulls, honed marble.
The old mirror cabinet stood about 5 inches off the wall over the sink. The new one sits inside the wall: we cut one stud, framed a header and a sill around the box, and set it flush.
Build log
17 working days, demo to final inspection
Week 1
Protection and demo. Dust wall at the door, then tile and fixtures out to the studs. Soft drywall behind the valve, a bare shaft, and a fan venting into the attic.
Week 2
Skylight and rough-in. New skylight flashed into the old opening, shaft insulated, fan ducted to the roof, vent shifted in the chase, blocking for the glass and vanity. Rough inspection passed.
Week 3
Walls and tile. Cement board and membrane, then the wall tile, the niche, and the marble floor.
Week 4
Finish and final. Vanity, cabinet, sconce, toilet, and trim, then the glass panel. Final inspection passed.
Glossy white 4x4 tile, warm gray grout, to the ceiling
Glass
Fixed 3/8-inch tempered panel, two brass clamps
Valve
Pressure-balance valve, handheld on a slide bar, brushed brass
Storage
Three recessed shelves in the old vent chase
Vanity
30-inch floating white oak, two drawers
Counter
White quartz, undermount sink, single-hole brass faucet
Floor
Honed marble 2-inch hexagon mosaic
Ventilation
Quiet fan on a humidity sensor, ducted to the roof
After: the view back toward the door.
The finished bath carries our workmanship warranty in writing. We remodel small bathrooms across South Orange County, including Aliso Viejo, Dana Point, and San Juan Capistrano.
The service behind this project
Looking for a bathroom remodeling contractor in Orange County?
If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.
Usually, yes. Most flat-glass skylights come in sizes that match the rough openings of older domes, so a new unit can go into the same opening with new flashing and no change to the ceiling below. If the old opening is an odd size, the curb is adjusted from the roof side.
It can be, as long as the room handles moisture. Steam rises into the shaft and condenses on any cold surface, so the shaft needs insulation on its attic side, the glass should be insulated, and the exhaust fan has to vent outdoors. A fan on a humidity sensor runs whenever the room needs it, without anyone remembering to switch it on.
For most households, yes. A panel that covers the half of the tub where the shower head sits keeps the spray in, and with no track on the rim there is nothing to leak or collect grime. If people aim the handheld toward the open end, a hinged panel or a full door is the better fit.
Often, yes. An interior wall has about 3 1/2 inches of space between the studs, enough for bottles and small towels. A wall that is built out around pipes, like the one behind this toilet, can give more depth. We check for pipes, wires, and ducts before cutting, and an outside wall needs insulation behind the box.
We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.