• CSLB #1085596
  • A+ Rated · 4.9· 80+ BBB reviews
  • 4.9· 150+ Google reviews
  • 1,000+ Projects Completed
Service
Hall bathroom remodel with a tub-to-shower conversion
Location
Diamond Bar, Los Angeles County
Home type
Two-story 1999 tract home, bath on the second floor
Timeline
August to September 2026, 19 working days on site
Materials
Marble-look porcelain, white zellige, LATICRETE HYDRO BAN, matte black
Scope
Demo to studs, subfloor repair, shower, vanity, toilet, fan, lighting

About This Project

The Tub Wall Had to Go

The homeowners' mother stays with them every winter, and the only shower upstairs was behind a 15-inch tub wall. Getting rid of that wall was the whole brief.

The hall bath in their 1999 Diamond Bar home was original: a honey oak vanity, a cultured marble top, brass fixtures, and a beige-tiled tub-shower behind a curtain. Nothing had failed outright. But the caulk was black in the corners, the paint was peeling, and a tan ring had spread across the ceiling over the tub.

Original 1999 hall bathroom with an oak vanity, cultured marble top, and beige-tiled tub-shower, Diamond Bar
Before: the 1999 bath, with the tub-shower along the right wall.
Remodeled hall bathroom with a white Shaker vanity, zellige back wall, and black-framed walk-in shower, Diamond Bar
After: the same spot. The shower fills the tub's footprint.

Keep a tub, or go walk-in?

Considered

A new tub with a grab bar. Better for bathing small kids, and some buyers look for one.

Chosen

A walk-in shower in the tub's footprint, with a bench and a handheld shower within reach of it.

Why: the primary bath keeps its tub, so the house still has one, and a bench shower works for their mother for years.

The stain was not the roof

What we found

In the attic, the fan's flexible duct had slipped off its fitting years ago and was blowing warm, wet air into the insulation. Every shower dripped a little onto the drywall over the tub. The peeling paint had the same cause.

What we did

New drywall and insulation, and an 80 CFM fan on a humidity sensor, with insulated duct sloped down and out the gable wall. We undercut the door 3/4 inch so the fan can pull air in from the hall.

Ring-shaped water stain on the old bathroom ceiling above a curtain rod, a can light, and a yellowed fan grille, Diamond Bar
Before: the ring over the tub, next to the old fan.
Square matte black rain head on a ceiling arm, framed by marble-look porcelain and black-framed glass, by Hybrid Renovations
After: a dry ceiling, and a rain head arm screwed to blocking.
Angel Valle, project manager at Hybrid Renovations

In a second-floor bath, a ceiling stain is usually the fan, not the roof. Paint over it and it's back by next winter.

Angel ValleProject Manager

A floor stiff enough for tile

Scope change: soft subfloor under the tub drain

A slow leak at the tub's overflow gasket had rotted the plywood under the drain, and a joist was notched two inches deep for the old trap. We sistered the joist and replaced a 3-by-4-foot section of subfloor. It added one day.

The cracked floor tile was the other clue. Porcelain wants a floor that bends no more than its span divided by 360, and one layer of 5/8-inch plywood didn't make it. We glued and screwed a second layer of 1/2-inch plywood every six inches, then an uncoupling membrane, then 24x24 porcelain.

That raised the floor 3/4 inch, so the toilet flange was reset on top of the finished tile instead of buried under it with stacked wax rings. The toilet is caulked at the front and sides and left open at the back, so a future leak shows on the floor instead of rotting the plywood.

Cracked beige floor tile and dark grout between an oak vanity and an old tub, before the remodel, Diamond Bar
Before: a cracked tile where the floor flexed.
Skirted one-piece toilet set between a white Shaker vanity and the black-framed shower glass, Hybrid Renovations
After: the toilet reset on the new floor.

A shower in the tub's footprint

Old alcove tub-shower with beige four-inch tile, a curtain, and mildewed caulk before Hybrid Renovations, Diamond Bar
Before: a 15-inch tub wall and a curtain.
Low marble-look curb and black-framed sliding glass in front of a herringbone shower floor with a square drain, Diamond Bar
After: a low curb and sliding glass.

How the shower went in

  1. A bigger drain. A tub drains through 1-1/2-inch pipe; a shower needs 2-inch. The new line runs between the joists and bores through one at its center, never notched.
  2. The valve moved up. From tub height to 48 inches on the same wall: a pressure-balance valve with a diverter, its hot limit set at 120 degrees.
  3. Flat walls first. Large panels show every bump, so every stud was checked with a straightedge and nine were planed or shimmed to 1/8 inch in 10 feet.
  4. Blocking everywhere. Solid wood behind the slide bar, the glass post, the rain head arm, and two future grab bar spots by the bench.
  5. Waterproof, then wait. HYDRO BAN Board on the walls and bench, liquid HYDRO BAN over a sloped mortar bed, and a 24-hour flood test before any tile.

Why the curb is level one way and sloped the other

The curb top tips toward the shower across its width, so splash runs back in. Along its length it is dead level, or sliding panels drift open on their own. The bottom track is set in silicone, not screwed through the curb: screws in a curb are the leak we find most often in other contractors' showers.

Long recessed shower niche and a matte black slide bar with a handheld shower by Hybrid Renovations, Diamond Bar
Detail: the niche sits in an inside wall.
Marble herringbone shower floor sloped to a square matte black drain beside large porcelain wall panels, Diamond Bar
Detail: marble herringbone, sloped to the drain.

The niche went in the right wall because it backs onto the hall closet. A niche in an outside wall leaves a thin spot in the insulation that sweats in winter. Its sill tips forward, and its edges are mitered porcelain with no metal trim.

Vanity, zellige, and walnut

Honey oak vanity with brass knobs, a cultured marble sink, and a four-bulb brass light bar, Diamond Bar
Before: oak, brass, and cultured marble.
White Shaker vanity with matte black pulls, a round black mirror, and white zellige by Hybrid Renovations, Diamond Bar
After: a 48-inch Shaker vanity on zellige.
Undermount sink, matte black faucet, and a quartz backsplash with a clean caulk line by Hybrid Renovations, Diamond Bar
Detail: one clean bead at the backsplash.

We picked a quartz top with marble veining because real marble etches under toothpaste and hard water. The light box moved three inches to center on the new mirror, and the drain moved up so the drawers clear the trap.

Walnut floating shelves with rolled towels and a trailing pothos on white zellige above the toilet, Diamond Bar

Handmade tile, set by eye

Zellige is fired clay, and no two pieces match in thickness or edge. We mixed four boxes on the floor, set the vertical stack to a laser line every few rows, and sealed the tile before grouting so the unglazed edges stayed white. The walnut shelves hang on hidden steel rods in blocking we added before the tile.

Build log

Four weeks, demo to final inspection

  • Week 1

    Protection and demo. Dust wall at the door, stairs covered, tub out, tile and drywall to the studs.

  • Week 2

    Floor, rough-in, attic. Joist sistered, subfloor rebuilt, drain, valve, blocking, fan and duct. Rough inspection passed.

  • Week 3

    Waterproofing and tile. Mortar bed and membrane, flood test, wall panels, zellige, floor.

  • Week 4

    Finish. Vanity, toilet, shelves, paint, fixtures, glass six days after templating. Final inspection passed.

Project specs

Room
About 6 by 9.5 feet, second floor
Shower
About 3 by 6 feet, full-width bench, low curb
Waterproofing
LATICRETE HYDRO BAN Board and liquid, bonding-flange drain
Valve
Pressure-balance with diverter, rain head and handheld
Wall tile
24x48 marble-look porcelain in the shower; 2x6 white zellige
Floor
24x24 marble-look porcelain over added plywood and LATICRETE STRATA_MAT
Glass
5/16-inch tempered, black-framed sliding panels
Vanity
48-inch white Shaker, white quartz top, undermount sink
Toilet
Skirted one-piece, 15 inches from center to the curb
Ventilation
Panasonic WhisperGreen Select, 80 CFM, humidity sensor, ducted outside
19 working days
80 CFM fan, ducted outside
24 hr flood test before tile
View back toward the bathroom door with a matte black towel bar, the shower bench, and sliding glass, Diamond Bar
After: looking back at the door, with the bench at the far end of the shower.

The first morning my mother used the new shower, she sat on the bench for a while just because she could. Angel sent us a photo of every step before it got covered up.

Teresa M.Homeowner, Diamond Bar

The finished bath carries our workmanship warranty in writing. We build walk-in shower conversions and bathroom remodels across the east San Gabriel Valley, including Walnut, Rowland Heights, and Hacienda Heights.

The service behind this project

Looking for a bathroom remodeling contractor in Los Angeles County?

  • Licensed and insured, CSLB #1085596
  • Workmanship warranty

Frequently asked questions

Thinking about a project like this?

If this project has you picturing your own home, you're not alone. These are the questions we answer most often for homeowners deciding to move forward, so you know exactly what working with us looks like.

Most tub-to-shower conversions we run take three to four weeks on site. This one took 19 working days, including a subfloor repair, a rough inspection, a 24-hour flood test, and a six-day wait for the glass, which is measured after the tile is set. Leaving the drain where it is and keeping the existing floor takes a few days off.

We usually suggest keeping at least one tub in the house, because families with young children look for one. In this Diamond Bar home the primary bath kept its tub, so turning the hall bath into a walk-in shower took nothing away. If the tub you want to replace is the only one, it's worth planning a tub somewhere else first.

No. California's building code requires bathroom exhaust to go outside. A fan that blows into the attic soaks the insulation and can drip back onto the ceiling, which is what stained this one. The duct should be insulated, short, sealed at every joint, and end at a wall or roof cap with a damper, with a humidity sensor running the fan.

Yes, on walls, if it's installed for what it is: handmade clay tile with uneven faces and edges. We mix pieces from several boxes, set them to an overall plane instead of forcing every edge flush, and seal the tile before grouting so the unglazed edges don't soak up grout color. We keep it off shower floors, where the uneven faces would hold water.

Still have questions?

Mon–Sun · 7 AM – 7 PM

FREE ESTIMATE

Get Your Free Estimate

We come to your home, look at the project, and give you a free, written estimate with no obligation. Construction, remodeling, and renovations across Los Angeles and Orange County.

  • Licensed and insured, CSLB #1085596
  • Free, whether or not you hire us
  • Same-day scheduling available
  • Measured on site, priced in writing
(562) 903-3955

Prefer to call? We answer 7 AM – 7 PM, Mon–Sun.

Tell us about your project